The Combined Committees comprises the following committees of council: Arts
Culture & Recreation, Community Development & Equity, Economic
Development & Sustainable Business, Environment, Heritage and Urban Form,
Finance & Corporate Business, Partnerships, Planning & Regulatory,
Planning Fixtures, Public Safety & Community Order, Transport & Urban
Linkages, Urban Strategy & Governance, Works & Services.
APOLOGIES
An apology has been received from Cr Hinchcliff.
EXTRAORDINARY BUSINESS
|
Section 46A(7) of the Local Government Official Information and
Meetings Act 1987 (as amended) states: |
|
“An item that is not on the agenda for a meeting may be dealt with at
that meeting if- |
|
(a) |
The local authority by resolution so decides; and |
|
(b) |
The presiding member explains at the meeting at a time when it is open
to the public,- |
| |
(i) |
The reason why the item is not on the agenda; and |
| |
(ii) |
The reason why the discussion of the item cannot be delayed until a
subsequent meeting.” |
|
Section 46A(7A) of the Local Government Official Information and
Meetings Act 1987 (as amended) states: |
|
“Where an item is not on the agenda for a meeting,- |
|
(a) |
That item may be discussed at that meeting if- |
| |
(i) |
That item is a minor matter relating to the general business of the
local authority; and |
| |
(ii) |
The presiding member explains at the beginning of the meeting, at a
time when it is open to the public, that the item will be discussed at the
meeting; but |
|
(b) |
no resolution, decision, or recommendation may be made in respect of
that item except to refer that item to a subsequent meeting of the local
authority for further discussion.” |
CHIEF EXECUTIVE'S OVERVIEW OF THE DRAFT ANNUAL PLAN 2005/2006
|
B Taylor |
|
|
Chief Executive |
16 February 2005 |
Providing an overview of the Draft Annual Plan 2005/2006 and advising that
prudent financial management has enabled the council to continue to deliver a
wide range of high quality services as well as progress some major projects.
Outlining the significant funding issues if Auckland is to become a sustainable
and sophisticated international city. A presentation will be given at this item
on the overview of the budget.
Recommending that council notes the opportunities and challenges that
developing Auckland into a sophisticated international city brings and the
additional funding required to meet these challenges.
|
[ATTACHMENT 3] |
Pages 1 - 10 |
LONG TERM PLANNING
REVISED STRATEGIC PLAN CONTENT FOLLOWING INTEGRATION OF “LEADING IN
URBAN SUSTAINABILITY”
|
G Morgan |
|
|
Policy Analyst, Strategic Development |
9 February 2005 |
Presenting the reviewed content for the strategic plan to align with the
Leading in Urban Sustainability paper from the Deputy Mayor. Advising that most
priority actions are funded and whilst changes have been identified these are
minor in nature and do not require an amendment to the long-term council
community plan (LTCCP).
Recommending that amended strategic plan content be included in the Draft
Annual Plan 2005/2006 for consultation.
|
[ATTACHMENT 4] |
Pages 11 - 30 |
TARGETS FOR THE 2006 PERCEPTION MEASURES
|
F Camburn |
|
|
Policy Analyst, Strategic Development |
14 February 2005 |
Presenting the recommended targets for the 2005/2006 to 2007/2008 perceptions
measures from the survey of residents and businesses. Advising that in 2003/2004
that 28% targets were met, 38% were not met and 34% were achieved within the
margin of error.
Recommending that the targets for the strategic perception measures for
2005/2006 be approved for inclusion in the Draft Annual Plan 2005/2006.
|
[ATTACHMENT 5] |
Pages 31 - 46 |
FINANCIAL FRAMEWORK
|
P Neutze |
|
|
Financial Strategy Manager |
24 February 2005 |
Summarising the financial impact of decisions made at the Annual Plan
Direction Setting meetings and providing the altered financial parameters that
reflect this direction.
Recommending that the updated forecast financial parameters be confirmed,
noting that new works projects will continue to be subject to strict capital
rationing and the proposed development contributions and targeted rates regimes
will enable new additional works in those areas.
|
[ATTACHMENT 6] |
Pages 47 - 57 |
DRAFT DEVELOPMENT CONTRIBUTIONS POLICY
|
S North/G Marr |
|
|
Financial Policy Analyst/Project Manager |
16 February 2005 |
Advising that a development contributions policy will assist the city in
meeting the costs of growth and addresses the equity issue that ratepayers
currently bear a large share of the cost of new infrastructure. Further advising
that the initial policy will be for community amenities, stormwater and open
space.
Recommending that the proposal to introduce a development contributions
policy from 1 July 2005 be included in the Draft Annual Plan 2005/2006 for
consultation.
|
[ATTACHMENT 7] |
Pages 58 - 89 |
OPERATIONAL OVERVIEW & ISSUES
OVERVIEW OF OPERATIONAL EXPENDITURE
|
C Field |
|
|
Manager Financial Planning |
21 February 2005 |
Presenting an overview of the 2005/2006 budget that shows rate revenue has
increased through a 3.2% general rate increase and the introduction of three
targeted rates.
Recommending that the budget for 2005/2006 based on rates revenue of $339.4
million and provision of a base-operating surplus of $15.76 million be accepted.
|
[ATTACHMENT 8] |
Pages 90 - 96 |
CAPITAL EXPENDITURE IMPACT ON OPERATIONAL EXPENDITURE AND DEPRECIATION
|
D Jeffrey |
|
|
Capital Planner |
15 February 2005 |
Advising of the increasing pressure being placed on operational budgets as a
result of high levels of capital expenditure and consequential operational
expenditure. Council has absorbed these costs through service level cuts or
increased or additional revenue sources, however this ongoing absorption is not
sustainable.
Recommending that the report from the Capital Planner dated 15 February 2005
be received and the pressures caused by consequential operating expenditure be
noted.
|
[ATTACHMENT 9] |
Pages 97 - 102 |
REPRIORITISATION & EFFICIENCY GAINS
|
T Munro |
|
|
Manager Procurement |
9 March 2005 |
Providing a summary of the savings and efficiency gains throughout the year
and detailing how these savings have been made.
Recommending that it be noted that the organisation continues to make savings
and efficiency gains that enable a number of increased costs to be absorbed in
the current operating budget envelopes.
|
[ATTACHMENT 10] |
Pages 103 - 110 |
OPERATING BUDGET REVIEWS
|
R Clark |
|
|
Project Accountant |
15 February 2005 |
Providing an overview of the operational budget reviews carried out for
Auckland City Libraries, City Planning, Finance and Business Services and
Utility Planning. Appendices to this report are the detailed reports on each
review.
Recommending that the reviews be noted and a number of recommendations be
incorporated into the Draft Annual Plan 2005/2006 for consultation.
|
[ATTACHMENT 11] |
Pages 111 - 187 |
2005/2006 ANNUAL PLAN COMMENT FROM COMMITTEES AND COMMUNITY BOARDS
|
S Muir |
|
|
Community Board Services Manager |
18 February 2005 |
Providing schedules of feedback from Community Boards and Committees on
requests for the 2005/2006 budgets.
Recommending that Councillors advise whether or not they wish to incorporate
any of these requests into the budgets, noting that some items on the schedule
are already included.
|
[ATTACHMENT 12] |
Pages 188 - 197 |
NON FUNCTIONAL TEXT FOR 2005/2006 DRAFT ANNUAL PLAN
|
C Field |
|
|
Manager Financial Planning |
21 February 2005 |
Providing the non-functional text for inclusion in the Draft Annual Plan
2005/2006 for feedback.
Recommending the non-functional text for the Draft Annual Plan 2005/2006 be
adopted for consultation, noting that numbers throughout the document will
change depending on decisions made at this meeting.
|
[ATTACHMENT 13] |
Pages 198 - 277 |
2005 ANNUAL PLAN - STATEMENTS OF PROPOSAL
|
D McGregor |
|
|
Policy Analyst |
23 February 2005 |
Providing an overview of the Statements of Proposal required in accordance
with the Local Government Act 2002 as part of this years draft annual plan
process.
Recommending that the Council notes the proposals required and approves the
attached statement of proposal concerning the proposal to sell the Otahuhu
Community Centre for inclusion in the draft annual plan.
|
[ATTACHMENT 14] |
Pages 278 - 281 |
RATING & REVENUE POLICIES
TARGETED RATES UPDATE AND OPTIONS
|
G Webb |
|
|
Financial Policy Analyst, Treasury |
24 February 2005 |
Outlining the existing targeted rates and discussing the new targeted rates
and their possible impacts that have been investigated over the last few months.
|
[ATTACHMENT 15] |
Pages 282 - 327 |
RATE REMISSIONS, DISCOUNT POLICY AND EXTENDED RATE REBATE POLICY FOR
2005/2006
|
C Usherwood |
|
|
Senior Analyst, Treasury |
23 February 2005 |
Providing the investigation of the possible options for readdressing levels
of assistance to low income ratepayers with regard to rates and wastewater
costs. Also outlining existing rate remission policies and the early discount
policy.
Recommending that the policies be approved for consultation as part of the
Draft Annual Plan 2005/2006.
|
[ATTACHMENT 16] |
Pages 328 - 349 |
VARIATIONS TO THE REVENUE AND FINANCING POLICY FOR 2005/2006
|
C Temple |
|
|
Manager Revenue Strategy |
|
This report was unavailable at the time the agenda went to print and will be
circulated under separate cover.
|
[ATTACHMENT 17] |
Pages 350 - 351 |
GENERAL RATING POLICY FOR 2005/2006
|
C Usherwood |
|
|
Senior Analyst, Treasury |
25 February 2005 |
Providing an overview of the general rating policies and statements for the
2005/2006 year.
Recommending that the policies be confirmed for consultation as part of the
Draft Annual Plan 2005/2006.
|
[ATTACHMENT 18] |
Pages 352 - 367 |
SUMMARY OF RATING POLICY IMPACTS
|
C Usherwood/G Webb |
|
|
Senior Analyst/Business Analyst, Treasury |
24 February 2005 |
Summarising the impacts from the various rating policies, including the
impact of the direction provided at the Annual Plan Direction Setting meeting in
February 2005.
Recommending the policies and impacts be noted.
|
[ATTACHMENT 19] |
Pages 368 - 371 |
ARTS, CULTURE & RECREATION FUNCTION
20.1. OVERVIEW OF SAVINGS AND REVENUE CHANGES FOR ARTS, CULTURE &
RECREATION FUNCTION
|
J Wiggins |
|
|
Function Champion |
28 January 2005 |
Providing an overview for this function which shows savings of $143,000, no
revenue increases are projected and $420,000 of bids have been accepted.
Recommending that savings, initiatives and revenue increases for this
function be included in the draft 2005/2006 budgets for consultation.
|
[ATTACHMENT 20.1] |
Pages 371 - 375 |
20.2. CBD STRATEGY - OPEX/CAPEX FUNDING 2005/2006
|
J Wiggins |
|
|
Manager Special Projects |
15 February 2005 |
Providing an overview of the proposed capital and operational expenditure for
the CBD that is to be funded from a mixture of targeted rats, financial
contributions and general rates.
Recommending that the existing programme and projects be noted and the new
initiatives of a CBD destination marketing plan and parking promotion initiative
be approved for funding from the CBD targeted rate.
|
[ATTACHMENT 20.2] |
Pages 376 - 384 |
20.3. OVERVIEW REPORT - TARGETED RATE FOR OPEN SPACE AND VOLCANIC CONES
|
M Vinall |
|
|
Group Manager, Community Planning |
17 February 2005 |
Reporting on the 1% targeted rate for open space and volcanic cones as
presented to the Annual Plan Direction Setting meeting in February and providing
a list of projects to be funded from such a rate.
Recommending that the targeted rate be introduced and the project list be
endorsed.
|
[ATTACHMENT 20.3] |
Pages 385 - 394 |
20.4. VIADUCT HARBOUR MARINE VILLAGE 2005/2006 BUDGET
|
V Terpstra |
|
|
Manager Viaduct Harbour Marine Village |
14 February 2005 |
Providing detail on the events budget for the Viaduct Harbour Marine Village
as part of the 2005/2006 draft annual plan process.
Recommending the operational budget of $135,935 and $3,736,100 capital
expenditure be endorsed, it being noted that final 10 year estimates for this
centre will be reported to the Urban Strategy and Governance Committee once the
results of the regional council consultation exercise are known.
|
[ATTACHMENT 20.4] |
Pages 395 - 406 |
20.5. CONTRIBUTIONS & BIDS
|
C Field |
|
|
Manager Financial Planning |
20 February 2005 |
Providing a summary and the detailed information of the contributions and
bids for this function. All accepted revenue increases and bids along with
rejected savings are in the draft budget and shown in yellow paper. All accepted
savings, rejected bids and revenue increases are not in the budget and are on
plain paper.
Recommending that the contributions and bids for this function be confirmed
for inclusion in the Draft Annual Plan 2005/2006 for consultation.
|
[ATTACHMENT 20.5] |
Pages 407 - 414 |
20.6. CAPITAL EXPENDITURE PROGRAMME
|
C Hudner |
|
|
Business Co-ordinator, Financial Planning |
20 February 2005 |
Providing the three year capital programme for this function by asset
management plan.
Recommending that the capital programme for this function be confirmed for
inclusion in the Draft Annual Plan 2005/2006.
|
[ATTACHMENT 20.6] |
Pages 415 - 430 |
20.7. FUNCTIONAL TEXT FOR DRAFT ANNUAL PLAN 2005/2006
|
C Field |
|
|
Manager Financial Planning |
21 February 2005 |
Providing the functional text for inclusion in the Draft Annual Plan
2005/2006 for feedback.
Recommending the functional text for the Draft Annual Plan 2005/2006 be
adopted for consultation, noting that numbers throughout the document will
change depending on decisions made at this meeting.
|
[ATTACHMENT 20.7] |
Pages 431 - 442 |
CITY DEVELOPMENT FUNCTION
21.1. OVERVIEW OF SAVINGS AND REVENUE CHANGES FOR CITY DEVELOPMENT
FUNCTION
|
J Duthie |
|
|
Function Champion |
16 February 2005 |
Providing an overview for this function which shows contributions of $2.545
million that are offset with bids of $2.993 million.
Recommending that savings, initiatives and revenue increases for this
function be included in the draft 2005/2006 budgets for consultation.
|
[ATTACHMENT 21.1] |
Pages 443 - 446 |
21.2. TARGETED RATE : HERITAGE AND URBAN DESIGN
|
J Duthie |
|
|
Function Champion |
16 February 2005 |
Reporting on the 0.5% targeted rate for heritage and urban design as
presented to the Annual Plan Direction Setting meeting in February and providing
a list of projects to be funded from such a rate.
Recommending that the targeted rate be introduced and the project list be
endorsed.
|
[ATTACHMENT 21.2] |
Pages 447 - 452 |
21.3. AUCKLAND CITY ENVIRONMENTS REVIEW OF FEES & CHARGES
|
J Oxley |
|
|
Group Manager, Auckland City Environments |
15 February 2005 |
Providing an analysis of fees and charges for building and resource consent
processes which establishes to what extent the group achieves council's policy
for full cost recovery of private benefit work. Advising that costs are not
currently being met and fees need to be reconsidered.
Recommending that in order to ensure full cost recovery of private benefit
work the fees and charges as set out in Appendix One of the report from the
Group Manager, ACE be incorporated in the Draft Annual Plan 2005/2006 for
consultation with a view to implementation on 1 July 2005.
|
[ATTACHMENT 21.3] |
Pages 453 - 466 |
21.4. HERITAGE WEEK
|
G Farrant |
|
|
Heritage Manager |
15 February 2005 |
Advising that heritage week took place between 4 -10 September in 2004 and
the Environment, Heritage and Urban Form Committee have recommended this event
occur again this year. Further advising that there is not budget provision for
this and requesting allocation of funds.
Recommending that a budget of $50,000 be provided for Heritage Week and that
$25,000 in sponsorship be sought.
|
[ATTACHMENT 21.4] |
Pages 467 - 472 |
21.5. FINANCIAL CONTRIBUTIONS
|
L Parkin |
|
|
Open Space Planner |
20 February 2005 |
Providing the recommendations from the Arts, Culture & Recreation
Committee in regard to financial contribution projects.
Recommending that the financial contributions projects be confirmed for
inclusion in the Draft Annual Plan 2005/2006.
|
[ATTACHMENT 21.5] |
Pages 473 - 488 |
21.6. CONTRIBUTIONS & BIDS
|
C Field |
|
|
Manager Financial Planning |
20 February 2005 |
Providing a summary and the detailed information of the contributions and
bids for this function. All accepted revenue increases and bids along with
rejected savings are in the draft budget and shown in yellow paper. All accepted
savings, rejected bids and revenue increases are not in the budget and are on
plain paper.
Recommending that the contributions and bids for this function be confirmed
for inclusion in the Draft Annual Plan 2005/2006 for consultation.
|
[ATTACHMENT 21.6] |
Pages 489 - 502 |
21.7. FUNCTIONAL TEXT FOR DRAFT ANNUAL PLAN 2005/2006
|
C Field |
|
|
Manager Financial Planning |
21 February 2005 |
Providing the functional text for inclusion in the Draft Annual Plan
2005/2006 for feedback.
Recommending the functional text for the Draft Annual Plan 2005/2006 be
adopted for consultation, noting that numbers throughout the document will
change depending on decisions made at this meeting.
CIVIC LEADERSHIP FUNCTION
22.1. OVERVIEW OF SAVINGS AND REVENUE CHANGES FOR CIVIC LEADERSHIP FUNCTION
|
D Walker |
|
|
Function Champion |
18 February 2005 |
Providing an overview for this function which shows total contributions of
$3.114 million, revenue increases of $907,000 and additional expenditure of
$1.786 million.
Recommending that savings, initiatives and revenue increases for this
function be included in the draft 2005/2006 budgets for consultation.
|
[ATTACHMENT 22.1] |
Pages 515 - 518 |
22.2. MAINSTREET DRAFT BUDGETS 2005/2006
|
J Giles |
|
|
Business Development Area Manager |
21 January 2005 |
Providing the recommendations and report from the Economic Development
Committee meeting on 2 February 2005 in relation to Mainstreet budgets.
Recommending the budgets be approved for inclusion in the draft annual plan
and no existing boundaries be altered. Also noting that a poll is being held in
the Rosebank area to determine if a business development precinct should be
implemented there.
|
[ATTACHMENT 22.2] |
Pages 519 - 526 |
22.3. CONTRIBUTIONS & BIDS
|
C Field |
|
|
Manager Financial Planning |
20 February 2005 |
Providing a summary and the detailed information of the contributions and
bids for this function. All accepted revenue increases and bids along with
rejected savings are in the draft budget and shown in yellow paper. All accepted
savings, rejected bids and revenue increases are not in the budget and are on
plain paper.
Recommending that the contributions and bids for this function be confirmed
for inclusion in the Draft Annual Plan 2005/2006 for consultation.
|
[ATTACHMENT 22.3] |
Pages 527 - 546 |
22.4. CAPITAL EXPENDITURE PROGRAMME : CIVIC LEADERSHIP
|
C Hudner |
|
|
Business Co-ordinator, Financial Planning |
20 February 2005 |
Providing the three year capital programme for this function by asset
management plan.
Recommending that the capital programme for Civic Leadership be confirmed for
inclusion in the Draft Annual Plan 2005/2006.
|
[ATTACHMENT 22.4] |
Pages 547 - 550 |
22.5. CAPITAL EXPENDITURE PROGRAMME : COMMERCIAL ACTIVITIES
|
C Hudner |
|
|
Business Co-ordinator, Financial Planning |
20 February 2005 |
Providing the three year capital programme for this function by asset
management plan.
Recommending that the capital programme for commercial activities be
confirmed for inclusion in the Draft Annual Plan 2005/2006.
|
[ATTACHMENT 22.5] |
Pages 551 - 576 |
22.6. FUNCTIONAL TEXT FOR DRAFT ANNUAL PLAN 2005/2006 : CIVIC LEADERSHIP
|
C Field |
|
|
Manager Financial Planning |
21 February 2005 |
Providing the functional text for inclusion in the Draft Annual Plan
2005/2006 for feedback.
Recommending the Civic Leadership text for the Draft Annual Plan 2005/2006 be
adopted for consultation, noting that numbers throughout the document will
change depending on decisions made at this meeting.
|
[ATTACHMENT 22.6] |
Pages 577 - 586 |
22.7. FUNCTIONAL TEXT FOR DRAFT ANNUAL PLAN 2005/2006 : COMMERCIAL ACTIVITIES
|
C Field |
|
|
Manager Financial Planning |
21 February 2005 |
Providing the functional text for inclusion in the Draft Annual Plan
2005/2006 for feedback.
Recommending the Commercial Activities text for the Draft Annual Plan
2005/2006 be adopted for consultation, noting that numbers throughout the
document will change depending on decisions made at this meeting.
|
[ATTACHMENT 22.7] |
Pages 587 - 592 |
COMMUNITY INFRASTRUCTURE FUNCTION
23.1. OVERVIEW OF SAVINGS AND REVENUE CHANGES FOR COMMUNITY INFRASTRUCTURE
FUNCTION
|
C Parr |
|
|
Function Champion |
16 February 2005 |
Providing an overview for this function which shows savings of $263,000, bids
of $1,726,000 for new activities were accepted into the budget.
Recommending that savings, initiatives and revenue increases for this
function be included in the draft 2005/2006 budgets for consultation.
|
[ATTACHMENT 23.1] |
Pages 593 - 598 |
23.2. ENHANCED ROLE IN COMMUNITY DEVELOPMENT
|
M Vinall |
|
|
Group Manager, Community Planning |
28 February 2005 |
This report was unavailable at the time the agenda went to print and will be
circulated under separate cover. It will cover the proposed projects for an
enhanced role in community development that was requested at the Annual Plan
Directoin Setting Meeting in February.
|
[ATTACHMENT 23.2] |
Pages 599 - 600 |
23.3. CONTRIBUTIONS & BIDS
|
C Field |
|
|
Manager Financial Planning |
20 February 2005 |
Providing a summary and the detailed information of the contributions and
bids for this function. All accepted revenue increases and bids along with
rejected savings are in the draft budget and shown in yellow paper. All accepted
savings, rejected bids and revenue increases are not in the budget and are on
plain paper.
Recommending that the contributions and bids for this function be confirmed
for inclusion in the Draft Annual Plan 2005/2006 for consultation.
|
[ATTACHMENT 23.3] |
Pages 601 - 612 |
23.4. CAPITAL EXPENDITURE PROGRAMME
|
C Hudner |
|
|
Business Co-ordinator, Financial Planning |
20 February 2005 |
Providing the three year capital programme for this function by asset
management plan.
Recommending that the capital programme for this function be confirmed for
inclusion in the Draft Annual Plan 2005/2006.
|
[ATTACHMENT 23.4] |
Pages 613 - 660 |
23.5. FUNCTIONAL TEXT FOR DRAFT ANNUAL PLAN 2005/2006
|
C Field |
|
|
Manager Financial Planning |
21 February 2005 |
Providing the functional text for inclusion in the Draft Annual Plan
2005/2006 for feedback.
Recommending the functional text for the Draft Annual Plan 2005/2006 be
adopted for consultation, noting that numbers throughout the document will
change depending on decisions made at this meeting.
|
[ATTACHMENT 23.5] |
Pages 661 - 674 |
ENVIRONMENTAL INFRASTRUCTURE FUNCTION
24.1. OVERVIEW OF SAVINGS AND REVENUE CHANGES FOR ENVIRONMENTAL
INFRASTRUCTURE FUNCTION
|
M McQuillan |
|
|
Function Champion |
16 February 2005 |
Providing an overview for this function which shows savings of $15,000 and
additional expenditure of $150,000.
Recommending that savings, initiatives and revenue increases for this
function be included in the draft 2005/2006 budgets for consultation.
|
[ATTACHMENT 24.1] |
Pages 675 - 676 |
24.2. 2005/2006 WAIHEKE ISLAND REFUSE TRANSFER STATION CHARGES
|
W Jaine |
|
|
Manager Resource Recovery |
10 February 2005 |
Advising of the proposed increase in gate charges for the Waiheke Island
transfer station which is in line with the policy adopted as part of Council's
long-term council community plan.
Recommending that the gate charges for the transfer station be increased by
approximately 16% and the special consultative procedure be instigated for this
proposed review to the by-law.
|
[ATTACHMENT 24.2] |
Pages 677 - 682 |
24.3. ISTHMUS WATER & SANITYARY SERVICES ASSESSMENT
|
G Paterson |
|
|
Manager Stormwater |
20 January 2005 |
Advising that as a requirement of the Local Government Act 2002 the city is
required to prepare a water and sanitary services assessment and providing
progress on these assessments along with the budget implications.
Recommending the draft Isthmus water and sanitary assessment endorse for
inclusion in the Draft Annual Plan 2005/2006.
|
[ATTACHMENT 24.3] |
Pages 683 - 692 |
24.4. CONTRIBUTIONS & BIDS
|
C Field |
|
|
Manager Financial Planning |
20 February 2005 |
Providing a summary and the detailed information of the contributions and
bids for this function. All accepted revenue increases and bids along with
rejected savings are in the draft budget and shown in yellow paper. All accepted
savings, rejected bids and revenue increases are not in the budget and are on
plain paper.
Recommending that the contributions and bids for this function be confirmed
for inclusion in the Draft Annual Plan 2005/2006 for consultation.
|
[ATTACHMENT 24.4] |
Pages 693 - 698 |
24.5. CAPITAL EXPENDITURE PROGRAMME
|
C Hudner |
|
|
Business Co-ordinator, Financial Planning |
20 February 2005 |
Providing the three year capital programme for this function by asset
management plan.
Recommending that the capital programme for this function be confirmed for
inclusion in the Draft Annual Plan 2005/2006.
|
[ATTACHMENT 24.5] |
Pages 699 - 716 |
24.6. FUNCTIONAL TEXT FOR DRAFT ANNUAL PLAN 2005/2006
|
C Field |
|
|
Manager Financial Planning |
21 February 2005 |
Providing the functional text for inclusion in the Draft Annual Plan
2005/2006 for feedback.
Recommending the functional text for the Draft Annual Plan 2005/2006 be
adopted for consultation, noting that numbers throughout the document will
change depending on decisions made at this meeting.
|
[ATTACHMENT 24.6] |
Pages 717 - 724 |
TRANSPORT FUNCTION
25.1. OVERVIEW OF SAVINGS AND REVENUE CHANGES FOR TRANSPORT FUNCTION
|
J Flanagan |
|
|
Function Champion |
16 February 2005 |
Providing an overview for this function which indicates the transport sector
has experienced increasing construction costs over and above the average
inflation for the country and to compensate this parking charges have been
increased.
Recommending that savings, initiatives and revenue increases for this
function be included in the draft 2005/2006 budgets for consultation.
|
[ATTACHMENT 25.1] |
Pages 725 - 728 |
25.2. TRANSPORT TARGETED RATE
|
J Bell |
|
|
Manager Transport Planning |
17 February 2005 |
Reporting on the 5% targeted rate for transport as presented to the Annual
Plan Direction Setting meeting in February and providing a list of projects to
be funded from such a rate.
Recommending that the targeted rate be introduced and the project list be
endorsed.
|
[ATTACHMENT 25.2] |
Pages 729 - 734 |
25.3. PROPOSED TARIFF INCREASE FOR PAY AND DISPLAY ON STREET PARKING
|
R Siddalls |
|
|
Parking Contracts Manager |
15 February 2005 |
Advising that the occupancy of parking spaces in the city's “tariff 4”
pay and display areas have reached a level equivalent to our “tariff 1”
areas and therefore it is proposed to change the tariff 4 areas to tariff 1,
that is from $3 per hour to $4 per hour.
Recommending that the tariff in “tariff 4” ($3 per hour) pay and display
areas be changed to the same as that in “tariff 1” ($4 per hour) areas and
the maximum parking times not be altered.
|
[ATTACHMENT 25.3] |
Pages 735 - 739 |
25.4. AUCKLAND DOMAIN AREA PARKING MANAGEMENT PROPOSAL
|
R Siddall |
|
|
Parking Contracts Manager |
26 January 2005 |
Advising that the parking issues within the Domain is causing restricted
access to recreational users and enforcement of current parking restrictions is
not creating sufficient turnover of available spaces.
Recommending pay and display areas be introduced in the Auckland Domain and
streets adjacent to the Auckland hospital to provide effective and efficient
management of the parking spaces available.
Note: This report was unavailable at the close of the agenda and will be
circulated under separate cover.
|
[ATTACHMENT 25.4] |
Pages 740 - 741 |
25.5. COLOURING OF BUS LANES
|
V Vencatachellum |
|
|
Senior Transport Planner |
16 February 2005 |
Reporting on a request from the Transport and Urban Linkages Committee in
regard to the cost and effectiveness of colouring bus lanes.
Recommending that Council endorse the regional standard for priority lane
signage, road marking and colouring for use within Auckland City and the
implementation of the standard be driven by the roading re-seal programme.
|
[ATTACHMENT 25.5] |
Pages 742 - 750 |
25.6. CONTRIBUTIONS & BIDS
|
C Field |
|
|
Manager Financial Planning |
20 February 2005 |
Providing a summary and the detailed information of the contributions and
bids for this function. All accepted revenue increases and bids along with
rejected savings are in the draft budget and shown in yellow paper. All accepted
savings, rejected bids and revenue increases are not in the budget and are on
plain paper.
Recommending that the contributions and bids for this function be confirmed
for inclusion in the Draft Annual Plan 2005/2006 for consultation.
|
[ATTACHMENT 25.6] |
Pages 751 - 762 |
25.7. CAPITAL EXPENDITURE PROGRAMME
|
C Hudner |
|
|
Business Co-ordinator, Financial Planning |
20 February 2005 |
Providing the three year capital programme for this function by asset
management plan.
Recommending that the capital programme for this function be confirmed for
inclusion in the Draft Annual Plan 2005/2006.
|
[ATTACHMENT 25.7] |
Pages 763 - 770 |
25.8. FUNCTIONAL TEXT FOR DRAFT ANNUAL PLAN 2005/2006
|
C Field |
|
|
Manager Financial Planning |
21 February 2005 |
Providing the functional text for inclusion in the Draft Annual Plan
2005/2006 for feedback.
Recommending the functional text for the Draft Annual Plan 2005/2006 be
adopted for consultation, noting that numbers throughout the document will
change depending on decisions made at this meeting.
|
[ATTACHMENT 25.8] |
Pages 771 - 780 |