MINUTES OF A MEETING OF THE AUCKLAND CITY COUNCIL

HELD ON THURSDAY, 19 JUNE 2008 AT 4:05PM

PRESENT: His Worship the Mayor Hon John Banks, QSO  
  Deputy Mayor David Hay, JP  
  Councillors: Douglas Armstrong, QSO  
    Ken Baguley  
    Aaron Bhatnagar  
    Dr Cathy Casey  
    Bill Christian, JP [until 4:55pm substantive item 2]
    Mark Donnelly  
    Graeme Easte  
    Glenda Fryer  
    John Lister, OBE  
    Peseta Sam Lotu-Iiga  
    Toni Millar, JP  
    Greg Moyle, E.D. [from 4:06pm item 2]
    Graeme Mulholland, JP  
    Richard Northey, ONZM  
    Noelene Raffills  
    Denise Roche  

  1. Top APOLOGIES

    His Worship the Mayor moved:

    Councillor Millar seconded:

    That the apologies from Councillors Boyle and Goldsmith for non-attendance and Councillor Moyle for lateness be accepted.

    CARRIED

  2. Top COMBINED COMMITTEES REPORT NO. 2/2008

    Councillor Armstrong moved:

    Councillor Christian seconded:

    That the report from Combined Committees report No. 2/2008 be adopted, ie:
     

  3. Top
     

  4. Top2008/2009 BUDGET UPDATE

    1. That the operational savings be approved as follows:
    Row Description 2008/2009 2009/2010 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016
    1 Regional funding requirement for the War Memorial Museum and MOTAT will be lower than expected. -513,000 0 0 0 0 0 0 0
    2 Recovery of Library's eLGAR Millennium support costs from other participating councils -470,352 -470,352 -470,352 -470,352 -470,352 -470,352 -470,352 -470,352
    3 Reducing CBD targeted rate funded initiatives recommended by CBD Board. (This saving can only be used to fund other CBD targeted rate initiatives and cannot be used for general purposes) -393,733 0 0 0 0 0 0 0
    4 Additional capitalisation of staff time for managing capital projects. -390,000 -390,000 -390,000 -390,000 -390,000 -390,000 -390,000 -390,000
    5 Reduction in insurance cost for lower claims experience and reduced consultancy costs -325,000 -325,000 -325,000 -325,000 -325,000 -325,000 -325,000 -325,000
    6 Reduction in budget from restructuring the Strategy Office -221,939 -221,939 -221,939 -221,939 -221,939 -221,939 -221,939 -221,939
    7 Reduced annual cost from rationalising the vehicle fleet -200,000 -566,000 -566,000 -566,000 -566,000 -566,000 -566,000 -566,000
    8 Lower costs for the arts agenda and asset management at the EDGE -122,000 -122,000 -122,000 -122,000 -122,000 -122,000 -122,000 -122,000
    9 Revised salaries budget based on actual positions and cost -96,000 -96,000 -96,000 -96,000 -96,000 -96,000 -96,000 -96,000
    10 Other budget savings from recent review -11,442 -11,442 -11,442 -11,442 -11,442 -11,442 -11,442 -11,442
    1. That the operational changes to existing services be approved as follows:

    Row Description 2008/ 2009 2009/ 2010 2010/ 2011 2011/ 2012 2012/ 2013 2013/ 2014 2014/ 2015 2015/ 2016
    11 Lower revenue from the sale of property information (mainly LIM reports) due to the expected slow down in the economy. Based on the actual revenue received in the past two months, it is anticipated that the level of revenue in 2008/09 would be lower by $50,000 per month. 600,000 0 0 0 0 0 0 0
    12 Lower budget for staff costs associated with slow down in LIM business activity. Partly offsets lower revenue. -100,000 0 0 0 0 0 0 0
    13 Lower revenue from consent fees due to the expected slow down in the economy and correction of earlier revenue projections 460,000 920,000 920,000 0 0 0 0 0
    14 Backfilling a position for a staff member seconded to Tamaki Transformation project. The cost can be covered in 2007/08 but increase in budget is needed for 2008/09 financial year. 100,000 0 0 0 0 0 0 0
    15 Updating salaries budget for the ACR restructure 200,000 200,000 200,000 200,000 200,000 200,000 200,000 200,000
    16 Increase in operational subsidies for recreation facilities as a result of new contract negotiations with facility operators ($129,000), and expenditure required for swimming pool procurement process for 2008/2009 ($100,000) 229,000 129,000 129,000 129,000 129,000 129,000 129,000 129,000
    17 Additional Viaduct Harbour Marine Village revenue due to deferring the marina capex one year -200,000 0 0 0 0 0 0 0
    18 Consequential operating cost not required for 2008/2009 due to revised ACR capital programme. -543,470 0 0 0 0 0 0 0
    19 Planning money for South Town Hall no longer required in 20008/09, as project has been deferred three years -240,000 0 0 240,000 0 0 0 0
    20 Increase in operating fees from marina trusts 349,931 349,931 349,931 349,931 349,931 349,931 349,931 349,931
    21 Current maintenance costs are not adequate, particularly for swing and pile berths. 217,930 217,930 217,930 217,930 217,930 217,930 217,930 217,930
    22 Decrease in interest revenue on berth purchase loans, as most of the loans have been repaid. 95,340 95,340 95,340 95,340 95,340 95,340 95,340 95,340
    23 Loss of rental revenue from selling the all four berths at Orakei marina. Asset sale is already in the budget. 60,000 0 0 0 0 0 0 0
    24 Amortisation arising from additional berths acquired in Downtown Marina Ltd 40,997 40,997 40,997 40,997 40,997 40,997 40,997 40,997
    25 Recovery of marina insurance from trusts -76,366 -76,366 -76,366 -76,366 -76,366 -76,366 -76,366 -76,366
    26 Increase in management fee charged to trusts -121,681 -121,681 -121,681 -121,681 -121,681 -121,681 -121,681 -121,681
    27 Increase berth charges by average of 12% -446,179 -446,179 -446,179 -446,179 -446,179 -446,179 -446,179 -446,179
    28 Reducing City Parks revenue Lower revenue expectation due higher costs 172,000 0 0 0 0 0 0 0
    29 Reduction in salaries from BSSR review – (small cost increase for 2008/09, saving from 2009/10) 5,114 -52,652 -52,652 -52,652 -52,652 -52,652 -52,652 -52,652
    30 Additional role to implement building development programme recommendations. Not having this type of role is a major risk to delivering the capital programme to 2015/2016. 40,000 80,000 80,000 80,000 0 0 0 0
    31 Salary for two project managers for property developments 200,383 200,383 200,383 200,383 200,383 200,383 200,383 200,383
    32 Funding for ground maintenance at Westhaven, which is not part of marina. 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000
    33 Commercial rental reviews and higher recoveries -18,051 -18,051 -18,051 -18,051 -18,051 -18,051 -18,051 -18,051
    34 Higher ground rental for commercial properties -101,644 -101,644 -101,644 -101,644 -101,644 -101,644 -101,644 -101,644
    35 Business and Events position is enhanced to the level of Programme Manager 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000
    36 Revision of visitor numbers and revenue projections to reflect the likely slow down in NZ economy. The delay to Te Wao Nui development will also affect revenue projections. 292,051 292,051 0 0 0 0 0 0
    1. That the operational increase for new initiatives be approved as follows:
    Row Description 2008/ 2009 2009/ 2010 2010/ 2011 2011/ 2012 2012/ 2013 2013/ 2014 2014/ 2015 2015/ 2016
    37 Funding for urban design assessment for unexpected development proposals. These would be high profile projects, which have an impact on the city and would significantly benefit from an urban design review. 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000
    38 Establishing a major events manager/coordinator to oversee all major events, $90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000
    39 Reviewing Metrowater's asset management plan by external advisors in conjunction with the review of Watercare's asset management plan 53,000 0 0 0 0 0 0 0
    40 Demolition of former Otahuhu recreation centre and interim reinstatement to open space due to deferring the new library and open space development 50,000 0 0 0 0 0 0 0
    41 Specialist taxation advice on setting up a holding company 30,000 0 0 0 0 0 0 0
    1. That a capital expenditure programme of $403 million for 2008/2009, an increase of $3.3 million over the amount reported in the draft 2008/2009 annual plan be approved, with major changes as follows:
    Row Description 2008/ 2009 2009/ 2010 2010/ 2011 2011/ 2012 2012/ 2013 2013/ 2014 2014/ 2015 2015/ 2016
    42 Re-phasing of Aotea Square development 4,093,262 7,381,940 -8,590,187 0 0 0 0 0
    43 Updating Art Gallery redevelopment for higher costs (Total cost now $113m) 6,199,576 -1,598,690 9,944,030 0 0 0 0 0
    44 Deferring Victoria and Albert St upgrades for a year -3,160,769 3,160,769 0 0 0 0 0 0
    45 Bring forward other streetscape upgrades to replace deferring Victoria and Albert St upgrades 2,310,769 -1,894,098 -416,671 0 0 0 0 0
    46 Deferring Facilities partnerships for revised programme -1,425,000 1,425,000 0 0 0 0 0 0
    47 Bringing forward renewal of Parnell Baths 2,000,000 0 0 -2,000,000 0 0 0 0
    48 Cancelling maintenance for tank at Parnell Bath because the renewal has been brought forward -410,000 0 0 0 0 0 0 0
    49 The development contribution growth component Welesy youth space project not included in cost of project and there is also increase in costs -1,500,000 2,445,000 0 0 0 0 0 0
    50 Re-phasing the Waterfront/ Wynard Pt development to reflect new project plan (there are further changes beyond 2015/16 -4,608,064 -2,991,215 -248,025 -9,943,590 -8,849,419 -7,878,677 -4,926,043 10,734,790
    51 Increased plant and equipment for City Parks to undertake new contracts 905,400 222,600 222,600 0 0 0 0 0
    52 Cancelling Maybury -Taniwha open space development -40,000 -200,000 -280,000 0 0 0 0 0
    53 Deferring Mt Richmond development work until 2011/12 -100,000 -800,000 -300,000 100,000 800,000 300,000 0 0
    54 Deferring Libraries website development for one year -75,000 75,000 0 0 0 0 0 0
    1. That it be noted that a 5.1% overall rate increase would fund the budget for 2008/2009 and provide $2.4 million to fund other initiatives not in the budget.
  5. Top Consultation and Hearings Process for the 2008/2009 Draft Annual Plan

    That following consideration of both written and oral submissions on the draft 2008/2009 annual plan, Council believes due consideration has been given to the various requests over the deliberation period, and accordingly resolves that the schedule of reports requested for committees emanating from the Annual Plan Hearings be confirmed.

  6. Top Draft 2008/2009 Annual Plan Public Research Results

    That the draft 2008/2009 annual plan public research results be received and considered during the decision making process.

  7. Top Rating Policies

    7.1. Rates Policy for 2008/2009

    1. That it be noted that the response from the public submissions to the draft 2008/2009 annual plan was broadly supportive of the rating policies that the Council decided to consult on, with no new significant issues raised.
    2. That it be noted that $1.8 million of corporate costs currently planned to be funded from the refuse collection targeted rate have now been reallocated to activities that are funded from the general rate and that adjusting the refuse collection targeted rate and Uniform Annual General Charge accordingly will not affect the overall rates increase.
    3. That it be noted that the changes in the refuse collection and recycling components of the refuse collection targeted rate means that the current level of rates remission offered for an approved refuse and/or recycling service no longer reflect the proportions of the total cost relating to each component and that changing the level of these two remissions to match the relevant proportion of total costs is not expected to have a material budget impact.
    4. That it be noted that central government has recently announced changes to its rates rebate scheme and that amending the Council's extended rates rebate scheme to reflect these changes is not expected to have a material budget impact.
    5. That the Auckland City Council's rates policies, consulted on via the 2008/2009 draft annual plan be adopted for the 2008/2009 annual plan, noting that key aspects of the rates policies for 2008/2009 will be as follows:
      1. a 5.1 per cent overall rates increase;
      2. a Uniform Annual General Charge of $162 per separately used or inhabited part;
      3. a refuse collection targeted rate of $210 per service (reflecting the recent reallocation of corporate costs);
      4. the application of the next step of the long-term general rate differential strategy;
      5. the discontinuation of the five value-based targeted rates;
      6. a Central Business District residential targeted rate of $55 per unit;
      7. increasing the Central Business District non-residential targeted rate in line with the next step of the differential strategy;
      8. new mainstreet budgets and targeted rates;
      9. a 3.2 per cent discount for full payment of rates before 5pm on 20 August 2008;
      10. a remission of $128 for an approved alternative refuse service and $71 for an approved alternative recycling service (reflecting changes in the refuse collection and recycling components of the refuse collection targeted rate); and
      11. a maximum rebate of $530 and an income threshold of $21,180 under the extended rates rebate scheme (reflecting changes in the central government scheme).
    6. That it be noted that officers will review all rates policies for the 2009-2019 Long-term council community plan and will address some of the minor issues raised in the submissions through that process.
    7. That officers be requested to report back to the Finance and Strategy Committee on ways to create incentives for more cost effective collection of rates for 2009/2010.
    8. That officers be requested to investigate the merits and cost of a system for payment of council rates, fines and other bills at New Zealand post shops, with transaction costs being added to the payment.

    7.2. Annual Plan 2008/2009 Metrowater Water Price Consultation Update

    1. That it be noted:
      1. That approximately two thirds of the submissions received in relation to the water price options proposed in the draft 2008/2009 annual plan were supportive of keeping water prices in line with the Council's rate of inflation by phasing out charitable payments.
      2. That the option for removing charitable payments immediately, and the option for freezing charitable payments at $24 million per annum, attracted 18% and 16% support respectively.
      3. That officers have reviewed all of the submissions in relation to Metrowater and water price issues and consider that no submission raises any significant new matters with regard to the proposed changes to the charitable payment scheme and water prices increases.
    2. That the option for keeping water prices in line with Council's rate of inflation by phasing out charitable payments be adopted for the 2008/2009 annual plan and that the 2006-2016 Long-term council community plan be updated accordingly.

    7.3. 2008 Development Contribution Policy: Submissions and Policy for Adoption

    1. That it be noted that the final 2008 Development Contributions Policy has had the following updates since being presented to Combined Committees in March 2008:
      1. an increase in the gross capital costs used in the development contribution charge setting for community amenity projects has resulted in an additional increase in the community amenity charge of $67 per Household Unit Equivalent;
      2. an increase in the transport charges for isthmus and Wynyard Point of $61, due to an increase in the gross capital costs of isthmus transport projects; and
      3. various minor changes to clarify issues raised by submitters and further legal advice.
    2. That Auckland City Council's 2008 Development Contributions Policy be adopted, effective from 1 July 2008, and that authority be delegated to the Chair of Combined Committees, the General Manager Finance and the General Manager City Development to make any minor amendments to the policy arising from the Combined Committees meeting, including consequential changes required because of other decisions made at the meeting.

    7.4. Fees and Charges for Temporary Use of the Road Reserve

    1. That the transport fees and charges for temporary use of the road reserve be adopted as follows for the 2008/2009 annual plan, noting that they allow the recovery of reasonable costs incurred by Council in the processing of notifications and the auditing of work sites:
    Item Service description Unit measure Fee from 1 July 2008
    (inc. GST) $
    1 Applications and occupations
    1.1 Road openings (see note 4.3)    
    1.1.1 Minor works including retrospective Each 21
    1.1.2 Major works Each 37.50
    1.1.3 Project works Each 67.50
    1.1.4 Urgent processing requests Each 90
    1.2 Operations in the street (see note 4.4)    
    1.2.1.1 Light casual in parking lane or berm area only Per day 45
    1.2.1.2 Light casual in parking lane or berm area only Per week 135
    1.2.2.1 Heavy casual in parking lane or berm area only Per day 90
    1.2.2.2 Heavy casual in parking lane or berm area only Per week 270
    1.2.3 Annual operators permit in parking lane or berm area only Each 3,375
    1.2.4 Mobile cranes – see 1.4 below    
    1.2.5 Urgent processing requests Each 90
    1.3 LUC construction sites    
    1.3.1 Traffic management plan reviews (maximum charge is $400 excl GST) Per hour 90
    1.3.2 Temporary use of road reserve for hoarding, loading zones or other purposes on the footpath only. For occupancy of traffic lanes, see 1.4    
    1.3.2.1 CBD, Newmarket, Ponsonby and Parnell m2 pa 337.50
    1.3.2.2 Arterials and other retail and mixed business areas m2 pa 225
    1.3.2.3 All other areas m2 pa 112.50
    1.3.3 Urgent processing requests Each 225
    1.4 Temporary full and partial road closures (exceeding five minutes in any hour)    
    1.4.1 Advertising Each at cost
    1.4.2 Administration, including invoicing Each 45
    1.4.3.1 Arterial class roads Lane per day 562.50
    1.4.3.2 Collector class roads Lane per day 281.25
    1.4.3.3 Residential class roads Lane per day 112.50
    1.4.4 Urgent processing requests Each 90
    1.5 Temporary parking and no parking resolutions    
    1.5.1 Permit application processing and site audit Each 100
      Note: Parking services loss of revenue charges are additional    
    2 Auditing
    2.1 Road openings    
    2.1.1 Minor works (performance based) Each 45
    2.1.2 Major works (performance based) Each 67.50
    2.1.3 Project works (weekly) Each 90
    2.1.4 Follow-up where a non-compliance notice (NCN) is issued – all sites by specified date and ongoing daily until completed by the contractor or the council Each 90
    2.1.5.1 Project pre-commencement inspections   No charge
    2.1.5.2 Project practical completion – first inspection Per hour 90
    2.1.5.3 Project practical completion – subsequent inspections where required Per hour 90
    2.1.5.4 Project end of maintenance inspections Per hour 90
    2.2 Operations in the street    
    2.2.1 All sites (performance based) Each 45
    2.2.2 Follow-up where a NCN is issued – all sites by specified date and ongoing daily until completed by the contractor or the council Each 90
    2.3 LUC construction sites    
    2.3.1 CBD, Newmarket, Ponsonby and Parnell (weekly) Each 45
    2.3.2 Arterials and other retail and mixed business areas (monthly) Each 45
    2.3.3 All other areas (random) Each 45
    2.3.4 Follow-up where a NCN is issued – all sites by specified date and ongoing daily until completed by the contractor or the council Each 90
    2.4 Street damage deposits and private-to-public drainage connections    
    2.4.1 Pre-commencement (optional) Each 67.50
    2.4.2 Post CCC (mandatory) Each 67.50
    2.4.3 Follow-up where a NCN is issued – all sites by specified date and ongoing daily until completed by the contractor or the council Each 90
    2.5 Requests for service    
    2.5.1 Principal or contractor cause Each 67.50
    2.5.2 Follow-up where a NCN is issued – all sites by specified date and ongoing daily until completed by the contractor or the council Each 90
    2.6 Temporary traffic management    
    2.6.1 All sites (random and if a NCN is issued) Each 67.50
    2.6.2 Follow-up where a NCN is issued – all sites by specified date and ongoing daily until completed by the contractor or the council Each 90
    3 Other
    3.1 Non-notified works    
    3.1.1 Non-notified and/or not approved Per site 281.25
    3.1.2 Further delay in submitting application Per day 56.25
    3.2 Non-permitted temporary traffic management    
      Early establishment or late disestablishment    
    3.2.1 Arterial class roads Per hour
    or
    part hour
    843.75
    3.2.2 Collector class roads 450
    3.2.3 Residential class roads 168.75
    3.3 Non-notified full or partial road closures    
    3.3.1 Arterial class roads Per lane
    per day
    or part day
    843.75
    3.3.2 Collector class roads 450
    3.3.3 Residential class roads 168.75
    3.4 Unidentified works    
      Sites identified after completion but not notified    
    3.4.1 Excavation and identification of cause by the council's contractor Per site At cost
    3.4.2 Non-notified works Per site 450
    3.4.3 Administration Per site 90
    3.5 Non-actioned non-compliance notice    
    3.5.1 Rectification by the council's contractor Per site At cost
    3.5.2 Administration Per site 90
    1. That officers be requested to report to the Long-term council community plan direction setting meeting in October 2008 on the effectiveness of the transport fees and charges for temporary use of the road reserve in terms of affecting contractor behaviour.

    7.5. Auckland City Environments Fees and Charges

    That the increase to Auckland City Environments' fees and charges for the 2008/2009 annual plan be approved as follows, noting that a further full review including benefit apportionment will take place in early 2009:

    1. Staff charge-out hourly rates
    Staff positions Fees from
    1 July 2008
    (inc. GST) $
    Senior planners, senior subdivision officers, licensing, team leaders 160
    Planners (levels 3 and 4), subdivision, licensing, environmental health specialists, arborists, urban designers 145
    Planners (levels 1 and 2), assistant planners, subdivision, licensing, planning technicians, urban design assistants 110
    Engineering, account or project managers 155
    Building officers, building inspectors, incident investigators, resource consent monitoring officers, environmental health officers 130
    Secretarial/administration staff 81
    1. Building consents

    Building control (where standard fees do not apply)

    Fee type by category Note Fee from
    1 July 2008
    (inc. GST) $
    Blasting
      Blasting permit   35
    Building code certificate
      Liquor and brothel licence applications   293
      Liquor and brothel licence applications – each additional inspection   73
    Building consent processing – certifier consents
      Certifier consents – no exclusions    consent category
    no longer applicable
      Certifier consents – with exclusions   consent category
    no longer applicable
    Code compliance certificate
      Code compliance certificate – where final inspection completed more than four years ago   422
      Code compliance certificate – work < $2,000   66
      Code compliance certificate – work $2,001 to 20,000   172
      Code compliance certificate – work $20,001 to $250,000   229
      Code compliance certificate – work $250,001 to $500,000   546
    Certificate of acceptance Deposit 992
    Certificate of compliance Deposit  
      Where application does not fit within standard fees   306
    Certificate of public use   At cost
    Compliance schedules
      Compliance schedule – administration fee   165
      Compliance schedule – per feature   60
    Disconnection of fire alarm
      Disconnection fee   253
    Exempt building work
      Including temporary works   150
    Extension of building consent
      Application to extend the time a building consent is valid   130
    Hoarding
      Per square metre   101
    Hoisting over footpath or public place
      Mobile crane or other hoisting device – half day   68
      Mobile crane or other hoisting device – full day   135
      Mobile crane or other hoisting device – per week   222
      Mobile crane or other hoisting device – per month   444
    Independently qualified person – application for acceptance as (three-year period)
      Base fee (also renewal fee)   70
      Charge per system or feature for which acceptance is sought   84
    Independently qualified person register
      Charge per copy   25
    Lapsing a building consent   168
    Liquor licence fees
      Liquor building certificate (building code certificate)   76
    Notice to fix
      Fee applies irrespective of whether the notice to fix is associated with a live building consent or not    At cost
    Plumbing consents
      Pre-paid plumbing consents (Enerco hot water cylinder installation) – book of 10   828
      Pre-paid plumbing consents (solar-powered hot water cylinder installation) – book of 10   828
    Producer statements
      Work up to the value of $1,000,000   184
      Work over the value of $1,000,000   296
    Product assessments   At cost
    Project information memorandum 
      Project information memorandum   97
      Application made with a building consent application   252
      Illegal building work   252
      Project information memorandum – solid fuel heaters   30
    Scaffolds
      Scaffold permit per 20m of street frontage per month   152
    Section 72   158
    Special inspection reports
      Safe and sanitary   252
    Swimming pools inspection – existing pools
      Swimming pool exemptions   766
      Swimming pool inspections (and re-inspections) – existing pools (from the third inspection)   199
    Temporary building work
      Exempt work   Exempt building work fees apply
    (see above)
      Non-exempt work   Standard building consent fees apply
    Tie backs
      Temporary tie backs per metre of frontage   88
    Use of street
      Use of street for building operations – central area. Monthly fee per square metre of street
    air space for the first 12 months, then fee per square metre per week thereafter.
    Plus 50 per cent base fee per additional occupied level
      100
      Use of street for building operations – other areas. Monthly fee per square metre of street
    air space for the first 12 months, then fee per square metre per week thereafter.
    Plus 50 per cent base fee per additional occupied level
      35
    Vehicle crossing permit
      Vehicle crossing permit   230
    Waivers
      Application for waivers Deposit 496
    Warrant of fitness
      Receipt, processing and issue of building warrant of fitness
    (only one compliance scheduled item)
      55
      Receipt, processing and issue of building warrant of fitness
    (more than one compliance scheduled item)
      110
    1. Building consent (where standard fees do not apply)
    Project categories O, P, Q, R, S 1 Fee from
    1 July 2008
    (inc. GST) $
    Estimated value of building work $ With producer statement Without producer statement
    500,001 to 1,000,000 624 1,180
    Additional for every 500,000 increment over 1,000,000 35 303

    Notes to table

    1 For building consent project category, see table on next page.

    1. Building consent processing charges (standard fees)

    The fee for a building consent is calculated by adding the components of the application. Additional fees may apply where other checks are required. All fees are in dollars.

    Project category Fee from 1 July 2008 (inc. GST) $
    Lodge Admin Planning check Building processing Records BRANZ BIA
    levy
    Drainage design Building over public drain Assess drainage video 1 Flood report Pump station Structural engineering Geo-technical engineering Fire engineering
    A 86 n/a 0 0     0 0 0 0 0 0 0 0
    B 86 n/a 44 65 35     80 158 158 118 383 80 80 80
    C 86 85 146 130 54     158 158 158 118 383 80 80 80
    D 86 85 146 260 54     158 158 158 118 383 80 80 80
    E 86 85 146 65 54     158 158 158 118 383 158 316 80
    F 86 85 146 260 54 Levy applies above $20,000 158 158 158 118 383 316 316 317
    G 86 85 146 260 54 158 158 158 118 383 316 316 158
    H 86 85 146 390 75     158 158 158 316 383 633 316 317
    I 86 85 146 390 75     238 158 158 316 383 633 316 158
    J 130 85 146 520 75     238 158 158 316 383 791 316 317
    K 130 85 292 520 75     238 158 158 316 383 475 316 158
    L 130 85 292 650 75     238 158 158 316 383 633 316 158
    M 86 85 292 390 90     317 158 158 316 383 633 316 158
    N 130 85 292 780 110     396 158 158 396 383 791 316 475
    T 86   44 39 0     0 0 0 0 0 0 0 0
    U

    No longer applicable

    V

    Notes to table

    1 Drainage video – fee for one line, $76 for each subsequent line.

    Categories O, P, Q, R, S are excluded from standard fees and will be subject to an estimate or deposit plus invoice.

    Inspections – standard (up to 40 minutes) $107, final or cladding inspection $169.

    1. Building consent project category
    A Minor consent L New dwelling (executive)
    B Building work up to the value of $2000 M Attached dwellings
    C Kitset carport and garages N Commercial buildings and residential alterations valued $250,001 to $499,999
    D Residential swimming pool and fencing O Commercial buildings and residential alterations valued $500,000 to $1,000,000
    E All other building work valued $2001 to $5000 P Buildings valued over $1,000,000
    F All other building work valued $5001 to $19,999 Q Change of use and earthquake prone buildings
    G Residential alterations and additions valued $20,000 to $99,000 R Amendments to existing consents
    H Commercial building work valued $20,000 to $99,000 (BRANZ and BIA levy starts in this category) S Staged consents
    I Residential alterations and additions valued $100,000 to $250,000 T House removals
    J Commercial building work valued $100,000 to $250,000 U Consent category no longer applicable
    K New dwelling (standard) V Consent category no longer applicable
    1. Building consent deposits Hauraki Gulf islands
    Value of work Deposit from
    1 July 2008
    (inc. GST) $
    Up to $5,000 500
    $5001 to 25,000 800
    $25001 to 50,000 1000
    $50,001 to $100,000 1000
    $100,001to $150,000 1000
    $150,001 to $250,000 1500
    $250,001 to $500,000 1500

    Note to table

    The total cost of the consent will be calculated on a time and cost basis using the approved hourly rates.

    1. Planning check for Hauraki Gulf islands
    Project category Fee from
    1 July 2008
    (inc. GST) $
    B 44
    C 146
    D 146
    E 146
    F 146
    G 146
    H 146
    I 146
    J 146
    K 292
    L 292
    M 292
    N 292
    U Consent category no longer available

    Note to table

    For building consent project category, see table on previous page.

    1. Land use, subdivision, and engineering consents

      Land use fees – Isthmus

    Fee type by category

    Note

    Fee from
    1 July 2008 (inc. GST)$
    Land use – isthmus
      Non-notified developments up to five units (excluding Hauraki Gulf islands) – total cost charged on a time-cost basis using the hourly rates Deposit 2,000
      Non-notified consent for developments of more than five units and up to and including 15 (excluding Hauraki Gulf islands) – total cost charged on a time-cost basis using the hourly rates Deposit 3,500
      Non-notified consent for developments of more than 15 units (excluding Hauraki Gulf islands) – total cost charged on a time-cost basis using the hourly rates Deposit 5,000
      Non-notified land use consent involving activities other than residential units and have more than three infringements and/or no written approvals Deposit 2,000
      Simple non-notified land use consent with restricted discretionary or restricted controlled activity status or discretionary status with one to three infringements and written approvals obtained Deposit 1,600
      Notified consent – developments up to five units Deposit  10,000
      Notified consents – developments more than five units and up to and including 15 units Deposit 15,000
      Notified consents – developments more than 15 units Deposit 20,000
    Notified land use consent involving activities other than residential units Deposit 10,000
    Limited-notified land use consent Deposit 5,000
      Outline plans/drawings lodged for consideration – total cost charged on a time-cost basis using the hourly rates Deposit 1,045
      Existing use rights assessment – central area Deposit 1,082
      Existing use rights assessment – other areas Deposit 522
      Confirmation of compliance certificate (Resource Management Act) Deposit 522
      Confirmation of compliance (signs bylaw) Deposit 522
      Consent to dispensation and/or exemptions or non-compliance with consolidated bylaw 1991 Deposit 2,000
      Section 127 Resource Management Act variation/cancellation   1,045
      Section 125 Resource Management Act – to extend the period a consent is valid   1,045
    Overseas investment certificate
      Required by overseas investors to confirm the property meets the council's requirements   303
    Liquor licence fees
      Liquor Planning Certificate   152
    1. Land use fees – Hauraki Gulf islands (HGI)
    Fee type by category

    Note

    Fee from
    1 July 2008
    (inc. GST) $

    HGI – Land use resource consents

      Section 127 Resource Management Act 1991 variation/cancellation   1,045
      Section 125 Resource Management Act 1991 – to extend the period a consent is valid   1,045
      Non-notified land use consent (controlled activities) Deposit Non-notified
    land use consent fees apply
      Non-notified land use consent Deposit 2,000
      Notified application Deposit 10,000
      Confirmation of compliance certificate (RMA) Deposit 522
    1. Subdivision consent processing fees
    Consent type

    Note

    Fee from
    1 July 2008
    (inc. GST) $
    Boundary adjustment Deposit 665
    Completion certificate (Section 224C of the Resource Management Act 1991) – simple (no engineering input required)   175
    Completion certificate (Section 224C of the Resource Management Act 1991) – complex (engineering input required) Deposit 500
    Freehold subdivision of existing or approved complying development Deposit 995
    Freehold subdivision of new vacant lots Deposit 1,570
    Freehold subdivision of existing or approved development with development control modifications,
    eg height in relation to boundary, coverage etc
    Deposit 1,570
    Right of way   409
    Survey plan   275
    Unit title Deposit 1,015
    Variations and amendments Deposit 1,570
    Crosslease - first stage Deposit 1,570
    Crosslease - any subsequent stage Deposit 706
    Deposit for combined application for land use consent and subdivision consent Deposit 3,500
    Removal of building line restrictions, creation of easement certificate, cancellation of easements, amalgamation of certificates of title, unit title (5(1)(g)) certificate   366
    1. Engineering fees
    Fee type by category

    Note

    Fee from
    1 July 2008
    (inc. GST) $
    Drainage
      Drainage Deposit 1,515
    Engineering approvals
      Up to 2 lots Deposit 605
      3 to 5 lots Deposit 1,210
      6 to 10 lots Deposit 3,790
      11 to 20 lots Deposit 5,300
      21 to 50 lots Deposit 10,610
      51 lots or over Deposit 15,190
    Producer statements
      Engineering related – per producer statement   52
    Right of way
      Engineering design right of way/jointly owned driveway Deposit 418
    Section 72
      Section 72 fee   86
    Subdivision bond
      Subdivision bond Deposit 835
    1. Bonds
    Bonds

    Note

    Fee from
    1 July 2008
    (inc. GST) $
    Processing bond applications relating to subdivision consent including return of money on satisfactory completion of work Deposit 835
    Application fee for bond relating to a land use consent (base fee charge may be greater depending on legal inputs)   650
    Administration of a bond relating to a land use consent, including release of the bond   625
    Processing an application to extend the time limit on an existing bond   112
    Processing an application for the partial release of a bond   345
    1. Environmental health and licensing fees
    Fee type by category Fee from
    1 July 2008
    (inc. GST) $
    All licences
      New premise application 130
    Amusement gallery/amusement devices
      Amusement gallery – annual licence 184
      Amusement device permit – per device, per 7 days 12.50
      Per additional device, per 7 days 2.40
      Per device, per additional 7 days or part 1.25
      Transfer of licence 55
      When combined with food – food fees plus 67
    Brothel licence
      Annual fee 591
    Camping grounds annual
      Camping grounds – new application 362
    Camping grounds
      Renewal 330
    Display of goods outside shops
      Permit 63
    Food premise licence annual fee
      Small low – risk A grade 242
      Small low – risk B grade 314
      Small low – risk D grade 386
      Small low – risk E grade 483
      Large low – risk A grade 362
      Large low – risk B grade 472
      Large low – risk D grade 579
      Large low – risk E grade 723
      Small medium – risk A grade 483
      Small medium – risk B grade 627
      Small medium – risk D grade 772
      Small medium – risk E grade 965
      Large medium – risk A grade 723
      Large medium – risk B grade 940
      Large medium – risk D grade 1,158
      Large medium – risk E grade 1,447
      Small high – risk A grade 723
      Small high – risk B grade 940
      Small high – risk D grade 1,158
      Small high – risk E grade 1,447
      Large high – risk A grade 1,086
      Large high – risk B grade 1,411
      Large high – risk D grade 1,737
      Large high – risk E grade 2,170
    Food stalls
      Market Operator Licence (blanket licence for low risk food stalls, ie fresh fruit and vegetables)
    Food stalls – one day only
    130

    30

      Level one – 12 months 30
      Level two – 6 months 90
      Level two – 12 months 150
      Level three – 6 months 180
      Level three – 12 months 300
    Funeral directors – mortuary licence
      Annual fee 362
    Hairdressers fees
      Hairdressers all premises per annum 167
    Hazardous substances – inspections
      Bulk tank demolished 127
      Bulk tank for repair and maintenance 127
      Bulk tank installed 149
      Class 2 gas installation (other) 95
      CNG storage cylinders installed 127
      Inspection of any dangerous goods area 95
      LPG storage tank installed 127
      LPG/CNG equipment installed 63
      Maintenance of pipework 63
      Oil burning equipment – installation 83
      Oil burning equipment – maintenance 63
      Pump installed and re-located 63
      Pump removal 42
      Pump replaced or fixed 63
      Storage tank installed 129
      Storage tank replacement 150
      Tank removal 82
      Test pipelines to bulk installations 95
      Transfer or copy of any licence 46
    Health and bathhouse annual  
      Health and bathhouse annual 242
    Health protection licence
      Basic (single process) 169
    Health protection licence annual
      Multi basic (multiple processes) 241
      High risk (involving skin penetration) 241
    Hourly rate for festival events
      Hourly rate for festival events 130

    Inspection fee

    130

    Mobile food vendor fee annual 26
    Mobile food – bun runner annual 26
    Offensive trades  
      Application – annual 301
      Renewal 301
    Street trading
      Cafe seating on pavement – fee per chair per annum 63
      Short-term trading (up to 12 months) – public place. Permit and monthly fee set within criteria 110
      Long-term trading (over 12 months) – public place. Permit plus monthly fee set within criteria 164
      Hawkers annual 29
      Mobile shops annual 142
    Transfer fee – all licences 72
    Seizures under bylaws At cost
    Bylaw dispensation (other than permanent signage)
      Eg temporary signage 110
    1. Dog registration fees
    Fee type by category  

     

    Fee from
    1 July 2008
    (inc. GST) $
    Animal Control
      Class S – Superannuitant   60 (40 if renewal paid before 31 July 2008)
    1. Property information fees
    Fee type by category Fee from
    1 July 2008
    (inc. GST) $
    Aerials
      GIS Plots – B&W aerials – 1993 8.50
      GIS Plots – Colour aerials – 1997 31
    Building consent report
      Approved building consents (monthly list) – approved/lodged consents – emailed 295
      Approved building consents (monthly list) – approved/lodged consents – printed and mailed 320
      Approved building consents (monthly list) – approved/lodged consents – printed over counter 315
    Drainage plans
      Private drainage plans – subsequent copies 7.50
    Faxes
      Faxes to Great Barrier Island – up to 10 pages 5
      Faxes to Great Barrier Island – 1 to 5 pages, per page see fee above
    (up to 10 pages)
      Faxes to Great Barrier Island – 6 to 10 pages, per page see fee above
    (up to 10 pages)
      Faxes to Great Barrier Island – 11 to 20 pages 10
      Faxes to Great Barrier Island – plus per page over 10 pages see fee above
    (11 to 20 pages)
      Faxes to Great Barrier Island – plus per page over 20 0.25
      Receiving faxes from Great Barrier Island – per page no charge
    LIMS
      Standard LIM (5 working days) 243
      Urgent LIM (4 hours) 312
    Map information
      Map information charge – 1 property map or 1 private drainage plan 12.50
    Neighbourhood report
      Neighbourhood report 30
    Print and copy
      A2/A1 prints microfilm/EDMS/paper 9
      A3 EDMS/microfilm 5
      A3 photocopies – paper records 0.60
      A4 EDMS copies 1
      A4 photocopies – paper records 0.50
      AO prints microfilm/EDMS/paper 14
      Building warrant of fitness (copy) 7
      Code compliance certificate (copy) 7
      Coin-operated photocopier A3 0.60
      Coin-operated photocopier A4 0.50
      Public drainage, water services and contours on one map 42
      Contours map, public drainage map and special features on same map for the same property 52
      GIS viewing and print one plot 22
      Site remediation report 8 plus copy charges
      Soil reports 8 plus copy charges
    Property maps
      Property maps subsequent copies – public drainage, zoning and limitations, special land features, contours 12
    Site file CD
      Counter – non-urgent 58
      Counter – urgent 68
      Counter– while you wait (up to 30 minutes) 78
      Internet – non-urgent 47
      Internet – urgent 58
    Site information charge
      For each site researched (assisted by staff for up to 15 minutes, thereafter charged on time and cost basis) no charge
      For each site researched 15
    Valuations
      Certified copy 27
      Additional data P3 see fee above
    (certified copy)
      Sales data P4 see fee above (certified copy)
      Valuation screen P1 see fee above (certified copy)
    1. That Metrowater's peer review fees, in accordance with the requirements of their Service Level Agreement with Auckland City Environments, be added to the applicants invoice as follows:
    Consent Advice Scale or other Advice Determinant Charge (inclusive of GST)*
    All large or complex projects Large $930 deposit To be supplemented by an hourly charge of $155 inc. GST where required
    Flood Hazard Small to Medium $155 (Fixed fee)
    Assessment of Environmental Effects Small to Medium $620 (Fixed fee)
    Build-overs   $250 (Fixed fee)
    Water Supply (including fire hydrants)   $155 (Fixed fee)
    Engineering (upgrading or extending the public supply and drainage system – SW, Ww and WS) Materials, Grades, Cover, Tree-related $155 (Fixed fee)
    Thrust, Outlets, Piping of open watercourses, Stormwater Treatment and Mitigation Devices, Soakage $310 (Fixed fee)

    Note: The fees are consistent with ACE engineers charge out rate, which are $155/hr.

  8. Top Annual Plan

    8.1. Other changes to 2008/2009 Budget

    A. That the following projects, as consulted on in the draft 2008/2009 annual plan, be deferred or cancelled:

    Row  Project name Brief description Change Operating cost impact of reinstating
    the project ($000s)
    2008/ 2009 2009/ 2010 2010/ 2011 2011 to 2016 per annum

    Arts, Community and Recreation

    1 Aotea Centre/Aotea Square interface $17.5 million to upgrade Aotea Centre external steps and terraces, new ticket sales and cafe kiosk Reduce budget by $7.9 million in 2009/2010 and 2010/2011 0 $123 $648 $1,098
    2 254 Ponsonby Road development $2 million to develop an urban square in the heart of the Ponsonby business area Defer 3 years to start in 2011/2012 $2 $45 $191 $126
    3 Sylvia Park surrounds $4 million to improve safety and quality of reserves in the Tamaki area Defer 3 years to start in 2012/2013 $0 $36 $207 $97
    4 Glen Innes town centre upgrade (stage two) $5 million to revitalise Glen Innes town centre business and residential areas Defer 3 years to start in 2012/2013 $0 $73 $268 $322
    5 Volcanic cones programme $5.5 million to protect and enhance Auckland city's volcanic features Defer $2 million of the 2009/2010 budget by 1 year $0 $80 $232 $30
    6 Tamaki streetscape upgrade $6 million to upgrade the public space in the business areas adjacent to the Tamaki campus and Mount Wellington Quarry residential development Defer 3 years to start in 2012/2013 $0 $73 $341 $385
    7 Mount Wellington quarry open space development $8.9 million to develop high quality open spaces within Mount Wellington Quarry development Defer 1 year to start in 2010/2011 $0 $78 $292 $140
    8 Open spaces land acquisition $12.5 million to purchase land around Wynyard Point and Viaduct Harbour Defer 1 year to start in 2015/2016 $0 $0 $0 $191
    9 Land purchases to improve harbour access $40 million to acquire land in order to improve access to coastal areas Defer 2 years to start in 2011/2012 $0 $363 $1,175 $1,132
    10 Harbour walkways – Blockhouse Bay to Onehunga $1.5 million to develop harbour walkways from Blockhouse Bay to Onehunga Defer 2 years to start in 2010/2011 $0 $4 $25 $60
    11 Glen Innes music and arts centre $5 million to build a music and art centre Defer 1 year to start in 2013/2014 $0 $0 $0 $132
    12 Point Erin pool redevelopment $5.4 million to provide all year facilities for the core activities of learning and fitness Defer 2 years to start in 2011/2012 $0 $116 $454 $124
    13 Jordan Recreation Centre redevelopment $6.7 million to improve the recreation centre in Onehunga to provide a modern and better functioning facility Defer 1 year to start in 2012/2013 $0 $0 $0 $141
    14 Auckland Domain sand carpet installation $5 million to install sand carpet and drainage to the lower sport fields of the Auckland Domain Defer 1 year to start in 2009/2010 $73 $288 $266 -$11
    15 Paved area renewals – citywide

    $2.6 million to renew paved surfaces within Auckland city's parks

    Defer $800,000 of capital expenditure by 1 year to 2009/2010 $32 $90 $60 -$2
    16 Auckland Zoo – Te Wao Nui $16 million to develop a dedicated precinct to highlight the unique flora and fauna of New Zealand Defer 1 year to complete project by 2010/2011 $144 $795 $185 -$7
    17 Lorne Street stage 2 (library and canopy) $5.2 million to improve pedestrian use in front of the central library by widening the footpaths, and introducing new paving and landscaping Defer 3 years to start in 2011/2012 $104 $439 $685 $149
    18 Pah Homestead restoration $5 million to restore Pah Homestead in Monte Cecilia Park Bring forward $1.5 million to prevent deterioration of the building, and defer $4.5 million for the restoration by 3 years to start in 2013/2014 -$56 -$193 -$103 $279
    19 Monte Cecilia Park development $1.2 million to improve the path network and restore the garden area surrounding Pah Homestead Defer 3 years to start in 2011/2012 $46 $130 $124 $3
    20 Otahuhu library redevelopment $6 million to construct a new library at the Otahuhu recreation precinct Defer 3 years to start in 2011/2012 $24 $180 $551 $325
    21 Improving community facilities $17 million to improve accessibility to community facilities and to complete the Wesley Youth Space project Retain $1.5 million in 2008/2009 for the Wesley Youth Space project, but cancel remainder of project $45 $230 $469 $1,168
    22 Blockhouse Bay library redevelopment $2.2 million to increase the capacity of Blockhouse Bay Library Defer 1 year to start in 2009/2010 $6 $91 $213 -$3
    23 Waiheke library redevelopment $3.2 million to build a new library at Oneroa Defer 1 year to start in 2009/2010 $63 $180 $120 -$5
    24 Mount Roskill library redevelopment $1.4 million to expand and redevelop the library in its current location Defer 1 year to start in 2009/2010 $38 $90 $37 -$2

    City Development

    25 Stormwater water quality improvements $16 million to build new stormwater assets, which will reduce the sewerage discharge into the harbours Cancelled, but the council will endeavour to reprioritise other projects to continue this work $80 $278 $480 $1,066

    Transport

    26 Temporary Civic car park $9.8 million to build a temporary car park to reduce parking space shortage during the Civic car park roof replacement Cancelled, as new construction method allows more car park spaces to be in use during construction $393 $1,318 $1,303 $1,261
    27 New wharves – Motuihe, Browns and Motutapu islands $5.5 million to provide access during all tides and facilities for smaller passenger ferries Defer 1 year to start in 2009/2010 $10 $107 $282 $65
    28 Liveable streets $29.5 million to improve safety and amenity of the roads for pedestrians and cyclists $1.5 million for 2008/2009 and the rest cancelled $0 $145 $616 $1,986
    29 Footpaths upgrade $49 million to upgrade the state of the city's footpath network and vehicle crossings  Defer $7.6 million of the 2008/2009 budget by 1 year $306 $864 $522 $233
    30 School transport safety initiatives $4.8 million to implement 40 km/h school speed zones, which provide safer environments outside schools Reduce budget by $300,000 in 2008/2009 and 2009/2010 $6 $32 $54 $53
    31 AMETI – land purchases $231 million to purchase land required to deliver transport infrastructure and service improvements in the Tamaki area Retain $33.7 million in 2008/2009, and defer remainder for 1 year $1,355 $4,295 $6,261 $1,422
    32 AMETI – construction $480 million in the next 8 years to progress design and construction phases to deliver transport infrastructure and service improvements in the Tamaki area Defer 1 year to start in 2010/2011 $0 $237 $2,348 $6,116
    33 Cycleway and walkway improvements $8 million to extend pedestrian and cycling network citywide Defer $3 million of 2012/2013 and 2013/2014 budget by 3 years 0 $0 $0 $127
    34 Tiverton and Wolverton improvements $8 million to upgrade these arterial roads for future transport demand Defer 3 years to start in 2011/2012 $72 $431 $726 $159
    35 Civic bus station development $10 million to build a bus station on the west Bledisloe car park site Cancelled $9 $55 $243 $902
    36 Neilson Street improvements $23.6 million to ease expected congestion and improve safety resulting from the SH20 Manukau Harbour crossing Defer 1 year to start in 2009/2010 $0 $15 $65 $385
    37 Unscheduled land acquisition $70 million over 6 years to purchase land designated for transport purposes, including Dominion Road Defer half of the budget by 1 year $58 $175 $245 $194
    38 Land acquisition for public transport initiatives $13.7 million to purchase land, build rail precincts, park and ride facilities, bus interchanges and passenger connections in growth priority areas Defer $850,000 of 2008/2009 budget by 1 year $16 $37 $36 $35
    39 Fanshawe Street traffic underpass $100 million to build an underpass beneath Fanshawe Street if required by the Wynyard Point development Defer 1 year to start in 20015/2016 $0 $0 $0 $1,059
    Civic Leadership
    40 Wynyard Point marine events centre $19.5 million to create a world-class marine events centre on the wharves north of Jellicoe Street Defer 1 year to start construction in 2009/2010 $241 $915 $929 $120
    41 Teal Park development $3 million to create a park and beach at Mechanics Bay Defer 3 years to start in 20011/2012 $80 $334 $435 $70
    42 Harbour Bridge Park development $3 million to create a park to the west of Auckland Harbour bridge Defer 3 years to start in 2011/2012 $40 $187 $336 $149
    43 Westhaven Marina open space development

    $19.6 million to develop public spaces at Westhaven Marina

    $800,000 required in 2008/2009 for design and defer remainder by 3 years to start in 2011/2012 $354 $1,697 $2,830 $663
    44 Wynyard Point pedestrian over-bridges $10 million for two pedestrian bridges over Fanshawe Street – one linking Victoria Park to the proposed Daldy Street park and one linking to Bouzaid Way Defer 1 year to start in 2012/2013 $0 $0 $0 $252
    45 International facilities $70 million contribution to create an international scale convention centre in the CBD Budget revised from $70 million to $60 million over 3 years from 2011/2012 $0 $0 $0 $1,694
    46 Development with Vision $349 million to support the council in taking a more active and enhanced development role to promote high quality developments Retain $95 million in 2009/2010 for strategic waterfront purchases and development, and defer remaining budget 2 years $4,637 $7,355 $5,912 $4,174
    47 Rugby World Cup 2011 and Eden Park precinct projects $22 million for infrastructure around the Eden Park precinct and $10 million to support the Rugby World Cup event Reduce budget from $50 million to $32 million $440 $2,220 $3,790 $2,495
    Total average rates impact $8,617 $24,006 $33,853 $30,553
    1. That the funding for the following projects and services be added to the budget with any additional operating expenditure funded from the $2.4 million surplus budgeted.
      1. replacement of the Civic Theatre seats - $1.27 million in 2008/2009;
      2. Cliff Road remediation project - $4 million in 2008/2009;
      3. street cleaning in suburban centres - $65,000 per annum with the Arts Culture and Recreation Committee to prioritise the suburban centres to receive the additional street cleaning;
      4. development of reserves one and two at Stonefields - $950,000 in 2008/2009.
    2. That the $2.4 million surplus in the 2008/2009 budget be retained to address the additional expenditure approved, and any unbudgeted issues that arise in 2008/2009.
    3. That the officers be requested to report on the Mt Roskill Community Board submission on prioritising the Pah Homestead restoration and prevention of deterioration ahead of the Mt Roskill Library upgrade and that the report be considered by the Mt Roskill Community Board and then a joint meeting of the Arts, Culture and Recreation Community Services Committees.
    4. That the strategic importance of the Onehunga area as a gateway to the city and as an area within which there are a number of proposed public works that will impact on Onehunga be noted, and that the following be included in the 2008/2009 annual plan:
      1. That an Area Plan be funded for the Maungakiekie/ Onehunga area that, following public consultation, will provide an agreed planning framework for the area that defines areas of growth, character areas, town centre development, business areas and future public works;
      2. That a masterplan be funded (in collaboration with the Auckland Regional Council) for the entire Onehunga Foreshore area;
      3. That as part of the open space network funds be provided for the purchase of additional recreational land / sports fields and open space at Captain Springs Road on the Mangere Inlet;
      4. That it be noted that a $40m fund has been provided from 2011/2012 for land purchases for harbour access, part of which are targeted at the Manukau Harbour, and that work will commence to scope and prioritise these strategic purchases;
      5. That it be noted that funding from 2010/2011 for further development of a coastal walkway along the Manukau Harbour within Auckland City Council boundaries, and expanding on the existing Onehunga walkways has been foreshadowed; and in addition, that the recent discussions with Transit NZ about the Onehunga motorway and the impact on the foreshore be noted; and that negotiations have commenced to ensure that Transit includes the necessary mitigation measures within the Outline Plan for the motorway widening.

    8.2. Annual Plan 2008/2009 with Amendments to the LTCCP 2006/2016 Document

    1. That the Auckland City Council's Annual Plan 2008/2009 document, which includes the amendments to Auckland City Council's Long-term council community plan 2006-2016 be adopted, subject to the following:
      1. page 74, that a new milestone be added to the existing arterial network as follows:

        Milestone
        Complete the preliminary design and consultation with the community on the short-term actions (eg clearway extension and restricted side road access) for improving access between the CBD and the Airport
        Milestone to be finished by
        May 2009
        Who is working with Council
        Transit NZ, Auckland Regional Transport Authority, Auckland International Airport Limited

      2. page 23, under Metrowater water prices, the second sentence to be amended to read "with our decision water prices will be limited to rises at the council's rate of inflation which we believe will improve affordability".
    2. That it be noted that all submissions raised regarding the content of the annual plan will be reconsidered by officers when preparing the 2009-2019 Long-term council community plan.
    3. That authority be delegated to the Chairman of the Finance and Strategy Committee and the General Manger Finance to make changes to Auckland City Council's Annual Plan 2008/2009 document, which includes the amendments to Auckland City Council's Long-term council community plan 2006-2016 document that reflects decisions from this meeting, Audit New Zealand requirements, and other minor editorial changes.
  9. Top Rates Resolution for 2008/2009

    1. That Auckland City Council's four rates instalment dates for the 2008/2009 financial year be confirmed as follows:
      • 20 August 2008
      • 20 November 2008
      • 20 February 2009
      • 20 May 2009
    2. That a 10 per cent penalty for late rates payments for the 2008/2009 financial year be approved.
    3. That the rates resolution (as per appendix 1) for the 2008/2009 financial year be adopted.

      Councillor Northey moved the following amendment:
      Councillor Fryer seconded:

      That the amendments moved at the 19 June 2008 Combined Committees meeting which were defeated, be adopted by Council noting that where different amendments were moved on the same subject, the amendment that was less radical in its effect be adopted.

      These amendments are:

      That it be a recommendation to Council:
      Item 4 – 2008/2009 Budget Update
      That row 38 "Establishing a major events manager/coordinator to oversee all major events, $90,000" be deleted from resolution C, for a saving of $90,000 annually.

    4. That a capital expenditure programme of $403 million for 2008/2009, an increase of $3.3 million over the amount reported in the draft 2008/2009 annual plan be approved as follows:
    Row Description 2008/ 09 2009/ 10 2010/ 11 2011/ 12 2012/ 13 2013/ 14 2014/ 15 2015/ 16
    52 Partial deferral Maybury -Taniwha open space development 40,000 0 200,000 280,000 0 0 0 0

    Item 5 – Consultation and Hearings Process for the 2008/2009 draft Annual Plan

    That following consideration of both written and oral submissions on the draft 2008/2009 annual plan, the schedule of reports requested for committees emanating from the Annual Plan Hearings be confirmed.

    Item 7.1 – Rates Policy for 2008/2009

    1. That the Auckland City Council's rates policies, consulted on via the 2008/2009 draft annual plan be adopted for the 2008/2009 annual plan, noting that key aspects of the rates policies for 2008/2009 will be as follows:
      1. a 7 per cent overall rates increase;
      2. a Uniform Annual General Charge of $95 per separately used or inhabited part;
      3. a refuse collection targeted rate of $210 per service (reflecting the recent reallocation of corporate costs) on an interim basis for the 2008/2009 year until a system that charges properties more closely according to the amount of rubbish generated is developed and implemented for 2009/2010 and succeeding years;
      4. a Central Business District residential targeted rate that will be changed from a uniform annual charge to a value based rate set at a level that will bring in the same income to Council".

      Item 7.2 – Annual Plan 2008/2009 Metrowater Water Price Consultation Update

    1. That it be noted:
      1. That approximately half of the submissions received in relation to the water price options proposed in the draft 2008/2009 annual plan were supportive of keeping water prices in line with the Council's rate of inflation by phasing out charitable payments.
      2. That the option for removing charitable payments immediately, and the option for freezing charitable payments at $24 million per annum, attracted approximately one-third and one-seventh support respectively.
    2. That the option for keeping water prices at current levels and phasing out charitable payments be adopted for the 2008/2009 annual plan and that the 2006-2016 Long-term council community plan be updated accordingly.

      Item 7.3 – 2008 Development Contributions Policy: Submissions and Policy for Adoption

    3. That community boards be involved in the process of identifying and prioritising growth related projects, in their wards, that may subsequently attract development contributions funding, as follows:
      1. This can include identifying where a project providing additional community amenities, network infrastructure or reserves capacity may be required to cope with predicted growth in the community, suggesting priorities for various projects that have arisen from detailed studies, input to the annual plan cycle and input into guiding strategy documents. Projects suggested by boards can be considered within the overall asset management-planning programme; those that meet the criteria set out in the relevant cost allocation methodology, may be eligible for funding, wholly or in part, through Development Contributions.

    Item 8.1 – Other Changes to 2008/2009 Budget

    1. That the following projects be included in the 2008/2009 annual plan:
    Row  Project name Brief description Change Operating cost impact of reinstating the project ($000s)
            2008/2009 2009/2010 2010/2011 2011 to 2016 per annum
    4 Glen Innes town centre upgrade (stage two) $5 million to revitalise Glen Innes town centre business and residential areas Defer 3 years to start in 2012/2013 $0 $73 $268 $322
    5 Volcanic cones programme $5.5 million to protect and enhance Auckland city's volcanic features Defer $2 million of the 2009/2010 budget by 1 year $0 $80 $232 $30
    7 Mount Wellington quarry open space development $8.9 million to develop high quality open spaces within Mount Wellington Quarry development Defer 1 year to start in 2010/2011 $0 $78 $292 $140
    9 Land purchases to improve harbour access $40 million to acquire land in order to improve access to coastal areas Defer 2 years to start in 2011/2012 $0 $363 $1,175 $1,132
    10 Harbour walkways – Blockhouse Bay to Onehunga $1.5 million to develop harbour walkways from Blockhouse Bay to Onehunga Defer 2 years to start in 2010/2011 $0 $4 $25 $60
    15 Paved area renewals – citywide $2.6 million to renew paved surfaces within Auckland city's parks Defer $800,000 of capital expenditure by 1 year to 2009/2010 $32 $90 $60 -$2
    17 Lorne Street stage 2 (library and canopy) $5.2 million to improve pedestrian use in front of the central library by widening the footpaths, and introducing new paving and landscaping Defer 3 years to start in 2011/2012 $104 $439 $685 $149
    18 Pah Homestead restoration $5 million to restore Pah Homestead in Monte Cecilia Park Bring forward $1.5 million to prevent deterioration of the building, and defer $4.5 million for the restoration by 3 years to start in 2013/2014 -$56 -$193 -$103 $279
    20 Otahuhu library redevelopment $6 million to construct a new library at the Otahuhu recreation precinct Defer 3 years to start in 2011/2012 $24 $180 $551 $325
    22 Blockhouse Bay library redevelopment $2.2 million to increase the capacity of Blockhouse Bay Library Defer 1 year to start in 2009/2010 $6 $91 $213 -$3
    24 Mount Roskill library redevelopment $1.4 million to expand and redevelop the library in its current location Defer 1 year to start in 2009/2010 $38 $90 $37 -$2
    25 Stormwater water quality improvements $16 million to build new stormwater assets, which will reduce the sewerage discharge into the harbours Cancelled, but the council will endeavour to reprioritise other projects to continue this work $80 $278 $480 $1,066
    28 Liveable streets $29.5 million to improve safety and amenity of the roads for pedestrians and cyclists $1.5 million for 2008/2009 and the rest cancelled $0 $145 $616 $1,986
    29 Footpaths upgrade $49 million to upgrade the state of the city's footpath network and vehicle crossings  Defer $7.6 million of the 2008/2009 budget by 1 year $306 $864 $522 $233
    30 School transport safety initiatives $4.8 million to implement 40 km/h school speed zones, which provide safer environments outside schools Reduce budget by $300,000 in 2008/2009 and 2009/2010 $6 $32 $54 $53
    33 Cycleway and walkway improvements $8 million to extend pedestrian and cycling network citywide Defer $3 million of 2012/2013 and 2013/2014 budget by 3 years 0 $0 $0 $127
    38 Land acquisition for public transport initiatives $13.7 million to purchase land, build rail precincts, park and ride facilities, bus interchanges and passenger connections in growth priority areas Defer $850,000 of 2008/2009 budget by 1 year $16 $37 $36 $35
      1. That the budget for the "International Facilities" project be deleted from the Long-term council community plan 2006-2016.
      2. That the following projects be included in the 2008/2009 annual plan:
        1. Aotea Square Upgrade – landscaping, urban design and public art ($1 million in 2008/2009, $4 million in 2009/2010);
        2. Heritage Funds ($300,000 to $600,000 increase in 2008/2009 through to 2015/2016);
        3. Council Contribution to the Restoration of the Onehunga Foreshore ($10 million in 2009/2010);
        4. Establishment of a public arts capital fund, as part of the review of the Long-term council community plan ($1 million in 2009/2010);
        5. Avondale Pool Planning and Investigation ($100,000 in 2008/2009).
      3. That the recent cuts to community development projects be reinstated in the 2008/2009 annual plan, as follows, at a total cost of $3,411,000 ($841,000 in 2008/2009; $1,076,000 in 2009/2010 and $1,494,000 in 20010/2011):
      2008/09 2009/10 2010/11
    PACIFIC/MAORI PROJECTS
    Pacific Island Advisory Board funding     50*
    Maori and Pacific Island scholarship fund   45* 45*
    Migrant & Pacific Island business network development   30* 30*
    Pacific outreach librarian 65 65 65
    Te Reo web content project 58 58 58
      123 198 248
    MIGRANTS/REFUGEES PROJECTS 
    Cross cultural training 10 10 10
    Citywide diversity programmes 100 100 100
    Refugees in sport initiative 13 13 13
    Inclusive Auckland worker 95 95 95
    Mt Roskill refugee young people's project 10 10 10
    Creative Communities facilitator     100*
    Diversity arts project and events 40* 40* 40*
      268 268 268
    COMMUNITY DEVELOPMENT PROJECTS
    Capacity Building for community & voluntary sector 150 150 150
    Improving accessibility of community facilities 150 150 150
    Library project development in low use areas 130 130 130
    Consumer health information content project 20 20 20
    Digital communities     18*
    Strategic funding partnership   15* 175*
    Art youth programmes in community facilities   60 60
    Riverside community worker     95
    Orana youth worker   60 60
    Apprenticeship graduation   25 25
    Glen Innes activities co-ordinator     95
      450 610 978
    Totals 841 1076 1494

    NOTE: * means that a cut to the budget has been reinstated for that year.

    1. That the following operational projects listed on Pages 57 and 58 in the Draft Annual plan be restored to the 2008/09 and subsequent years budgets:
      1. (a) Secure asset management of heritage (page 57) at $200,000;
      2. (b) Fill the climate change position (p58) at $100,000;
      3. (c) Maintain the corporate sustainability initiative (p58) at $50,000;
      4. (d) Continue with kitchen and garden waste collection programme (p58) at $430,000.
      1. That the following community assistance grants be included in the 2008/2009 annual plan:
    Applicant Purpose Request Grant Amendment
    Auckland Polish Association Table tennis table 500 NIL 500
    Burundian Community Group Swimming lessons 2,750 NIL 2,750
    Foundation for Self-Knowledge Vedic music/meditation workshop 4,398 NIL 2,000
    GenderBridge Costs associated with a networking event 1,685 NIL 1,650
    NZ Sri Lank Buddhist Trust Volunteers to help trips for elderly 2,485 NIL 1,000
    NZ Teluga Association Diwali celebration 4,277 NIL 2,000
    Sing Waiheke Transport choir to concert 3,123 NIL 2,100
    Vikings Kiwi Tag Club Buy printer 830 NIL 830
    Bhartiya Samaj Chritable Trust Buy musical instruments 4,600 2,000 2,000*
    Body Positive HIV/AIDS testing education and awareness 9,440 3,000 3,000*
    Migrant Action Trust Migrant mentoring programme 7,810 2,500 2,500*
    Port Fitzroy Boating Club Cost of 2009 Mussel Fest 6,500 4,500 1,500*
    Starjam Charitable Trust Buy and install CRM database 6,710 3,000 3,000*
    Touch Compass Dance Trust Integrated workshop series 6,300 3,000 3,000*
    TOTAL 27,830
    1. That the budget for "Rugby World Cup 2011 and Eden Park precinct projects" be reduced from $50 million to $4 million and that the $4 million be tagged for infrastructure.

    Item 9 - Rates Resolution for 2008/2009

    1. That the rates resolution for the 2008/2009 financial year be adopted, except that the general uniform charge be abolished and the general rate be adjusted accordingly.

    A division was called for, voting on which was as follows:

    For the Amendment: Against the Amendment:
    Councillors: Cathy Casey

    Graeme Easte

    Glenda Fryer

    Richard Northey

    Denise Roche

    Councillors: Douglas Armstrong

    Ken Baguley

    Aaron Bhatnagar

    Bill Christian

    Mark Donnelly

    Deputy Mayor David Hay

    John Lister

    Peseta Sam Lotu-Iiga

    Toni Millar

    Greg Moyle

    Graeme Mulholland

    Noelene Raffills

    His Worship the Mayor John Banks

    Councillors Leila Boyle and Paul Goldsmith were absent.

    The amendment was declared LOST by 13 votes to 5.

    His Worship the Mayor put the following substantive motion

    That the report No. 2/2008 from Combined Committees be adopted, ie:

  1. Top2008/2009 BUDGET UPDATE

    1. That the operational savings be approved as follows:
    Row Description 2008/2009 2009/2010 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016
    1 Regional funding requirement for the War Memorial Museum and MOTAT will be lower than expected. -513,000 0 0 0 0 0 0 0
    2 Recovery of Library's eLGAR Millennium support costs from other participating councils -470,352 -470,352 -470,352 -470,352 -470,352 -470,352 -470,352 -470,352
    3 Reducing CBD targeted rate funded initiatives recommended by CBD Board. (This saving can only be used to fund other CBD targeted rate initiatives and cannot be used for general purposes) -393,733 0 0 0 0 0 0 0
    4 Additional capitalisation of staff time for managing capital projects. -390,000 -390,000 -390,000 -390,000 -390,000 -390,000 -390,000 -390,000

    5

    Reduction in insurance cost for lower claims experience and reduced consultancy costs -325,000 -325,000 -325,000 -325,000 -325,000 -325,000 -325,000 -325,000

    6

    Reduction in budget from restructuring the Strategy Office -221,939 -221,939 -221,939 -221,939 -221,939 -221,939 -221,939 -221,939

    7

    Reduced annual cost from rationalising the vehicle fleet -200,000 -566,000 -566,000 -566,000 -566,000 -566,000 -566,000 -566,000

    8

    Lower costs for the arts agenda and asset management at the EDGE -122,000 -122,000 -122,000 -122,000 -122,000 -122,000 -122,000 -122,000

    9

    Revised salaries budget based on actual positions and cost -96,000 -96,000 -96,000 -96,000 -96,000 -96,000 -96,000 -96,000

    10

    Other budget savings from recent review -11,442 -11,442 -11,442 -11,442 -11,442 -11,442 -11,442 -11,442
    1. That the operational changes to existing services be approved as follows:
    Row Description 2008/ 2009 2009/ 2010 2010/ 2011 2011/ 2012 2012/ 2013 2013/ 2014 2014/ 2015 2015/ 2016
    11 Lower revenue from the sale of property information (mainly LIM reports) due to the expected slow down in the economy. Based on the actual revenue received in the past two months, it is anticipated that the level of revenue in 2008/09 would be lower by $50,000 per month. 600,000 0 0 0 0 0 0 0
    12 Lower budget for staff costs associated with slow down in LIM business activity. Partly offsets lower revenue. -100,000 0 0 0 0 0 0 0
    13 Lower revenue from consent fees due to the expected slow down in the economy and correction of earlier revenue projections 460,000 920,000 920,000 0 0 0 0 0
    14 Backfilling a position for a staff member seconded to Tamaki Transformation project. The cost can be covered in 2007/08 but increase in budget is needed for 2008/09 financial year. 100,000 0 0 0 0 0 0 0
    15 Updating salaries budget for the ACR restructure 200,000 200,000 200,000 200,000 200,000 200,000 200,000 200,000
    16 Increase in operational subsidies for recreation facilities as a result of new contract negotiations with facility operators ($129,000), and expenditure required for swimming pool procurement process for 2008/2009 ($100,000) 229,000 129,000 129,000 129,000 129,000 129,000 129,000 129,000
    17 Additional Viaduct Harbour Marine Village revenue due to deferring the marina capex one year -200,000 0 0 0 0 0 0 0
    18 Consequential operating cost not required for 2008/2009 due to revised ACR capital programme. -543,470 0 0 0 0 0 0 0
    19 Planning money for South Town Hall no longer required in 20008/09, as project has been deferred three years -240,000 0 0 240,000 0 0 0 0
    20 Increase in operating fees from marina trusts 349,931 349,931 349,931 349,931 349,931 349,931 349,931 349,931
    21 Current maintenance costs are not adequate, particularly for swing and pile berths. 217,930 217,930 217,930 217,930 217,930 217,930 217,930 217,930
    22 Decrease in interest revenue on berth purchase loans, as most of the loans have been repaid. 95,340 95,340 95,340 95,340 95,340 95,340 95,340 95,340
    23 Loss of rental revenue from selling the all four berths at Orakei marina. Asset sale is already in the budget. 60,000 0 0 0 0 0 0 0
    24 Amortisation arising from additional berths acquired in Downtown Marina Ltd 40,997 40,997 40,997 40,997 40,997 40,997 40,997 40,997
    25 Recovery of marina insurance from trusts -76,366 -76,366 -76,366 -76,366 -76,366 -76,366 -76,366 -76,366
    26 Increase in management fee charged to trusts -121,681 -121,681 -121,681 -121,681 -121,681 -121,681 -121,681 -121,681
    27 Increase berth charges by average of 12% -446,179 -446,179 -446,179 -446,179 -446,179 -446,179 -446,179 -446,179
    28 Reducing City Parks revenue Lower revenue expectation due higher costs 172,000 0 0 0 0 0 0 0
    29 Reduction in salaries from BSSR review – (small cost increase for 2008/09, saving from 2009/10) 5,114 -52,652 -52,652 -52,652 -52,652 -52,652 -52,652 -52,652
    30 Additional role to implement building development programme recommendations. Not having this type of role is a major risk to delivering the capital programme to 2015/2016. 40,000 80,000 80,000 80,000 0 0 0 0
    31 Salary for two project managers for property developments 200,383 200,383 200,383 200,383 200,383 200,383 200,383 200,383
    32 Funding for ground maintenance at Westhaven, which is not part of marina. 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000
    33 Commercial rental reviews and higher recoveries -18,051 -18,051 -18,051 -18,051 -18,051 -18,051 -18,051 -18,051
    34 Higher ground rental for commercial properties -101,644 -101,644 -101,644 -101,644 -101,644 -101,644 -101,644 -101,644
    35 Business and Events position is enhanced to the level of Programme Manager 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000
    36 Revision of visitor numbers and revenue projections to reflect the likely slow down in NZ economy. The delay to Te Wao Nui development will also affect revenue projections. 292,051 292,051 0 0 0 0 0 0
    1. That the operational increase for new initiatives be approved as follows:
    Row Description 2008/ 2009 2009/ 2010 2010/ 2011 2011/ 2012 2012/ 2013 2013/ 2014 2014/ 2015 2015/ 2016
    37 Funding for urban design assessment for unexpected development proposals. These would be high profile projects, which have an impact on the city and would significantly benefit from an urban design review. 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000
    38 Establishing a major events manager/coordinator to oversee all major events, $90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000
    39 Reviewing Metrowater's asset management plan by external advisors in conjunction with the review of Watercare's asset management plan 53,000 0 0 0 0 0 0 0
    40 Demolition of former Otahuhu recreation centre and interim reinstatement to open space due to deferring the new library and open space development 50,000 0 0 0 0 0 0 0
    41 Specialist taxation advice on setting up a holding company 30,000 0 0 0 0 0 0 0
    1. That a capital expenditure programme of $403 million for 2008/2009, an increase of $3.3 million over the amount reported in the draft 2008/2009 annual plan be approved, with major changes as follows:
    Row Description 2008/ 2009 2009/ 2010 2010/ 2011 2011/ 2012 2012/ 2013 2013/ 2014 2014/ 2015 2015/ 2016
    42 Re-phasing of Aotea Square development 4,093,262 7,381,940 -8,590,187 0 0 0 0 0
    43 Updating Art Gallery redevelopment for higher costs (Total cost now $113m) 6,199,576 -1,598,690 9,944,030 0 0 0 0 0
    44 Deferring Victoria and Albert St upgrades for a year -3,160,769 3,160,769 0 0 0 0 0 0
    45 Bring forward other streetscape upgrades to replace deferring Victoria and Albert St upgrades 2,310,769 -1,894,098 -416,671 0 0 0 0 0
    46 Deferring Facilities partnerships for revised programme -1,425,000 1,425,000 0 0 0 0 0 0
    47 Bringing forward renewal of Parnell Baths 2,000,000 0 0 -2,000,000 0 0 0 0
    48 Cancelling maintenance for tank at Parnell Bath because the renewal has been brought forward -410,000 0 0 0 0 0 0 0
    49 The development contribution growth component Welesy youth space project not included in cost of project and there is also increase in costs -1,500,000 2,445,000 0 0 0 0 0 0
    50 Re-phasing the Waterfront/ Wynard Pt development to reflect new project plan (there are further changes beyond 2015/16 -4,608,064 -2,991,215 -248,025 -9,943,590 -8,849,419 -7,878,677 -4,926,043 10,734,790
    51 Increased plant and equipment for City Parks to undertake new contracts 905,400 222,600 222,600 0 0 0 0 0
    52 Cancelling Maybury -Taniwha open space development -40,000 -200,000 -280,000 0 0 0 0 0
    53 Deferring Mt Richmond development work until 2011/12 -100,000 -800,000 -300,000 100,000 800,000 300,000 0 0
    54 Deferring Libraries website development for one year -75,000 75,000 0 0 0 0 0 0
    1. That it be noted that a 5.1% overall rate increase would fund the budget for 2008/2009 and provide $2.4 million to fund other initiatives not in the budget.
  2. Top Consultation and Hearings Process for the 2008/2009 Draft Annual Plan

    That following consideration of both written and oral submissions on the draft 2008/2009 annual plan, Council believes due consideration has been given to the various requests over the deliberation period, and accordingly resolves that the schedule of reports requested for committees emanating from the Annual Plan Hearings be confirmed.

  3. Top Draft 2008/2009 Annual Plan Public Research Results

    That the draft 2008/2009 annual plan public research results be received and considered during the decision making process.

  4. Top Rating Policies

    7.1. Rates Policy for 2008/2009

    1. That it be noted that the response from the public submissions to the draft 2008/2009 annual plan was broadly supportive of the rating policies that the Council decided to consult on, with no new significant issues raised.
    2. That it be noted that $1.8 million of corporate costs currently planned to be funded from the refuse collection targeted rate have now been reallocated to activities that are funded from the general rate and that adjusting the refuse collection targeted rate and Uniform Annual General Charge accordingly will not affect the overall rates increase.
    3. That it be noted that the changes in the refuse collection and recycling components of the refuse collection targeted rate means that the current level of rates remission offered for an approved refuse and/or recycling service no longer reflect the proportions of the total cost relating to each component and that changing the level of these two remissions to match the relevant proportion of total costs is not expected to have a material budget impact.
    4. That it be noted that central government has recently announced changes to its rates rebate scheme and that amending the Council's extended rates rebate scheme to reflect these changes is not expected to have a material budget impact.
    5. That the Auckland City Council's rates policies, consulted on via the 2008/2009 draft annual plan be adopted for the 2008/2009 annual plan, noting that key aspects of the rates policies for 2008/2009 will be as follows:
      1. a 5.1 per cent overall rates increase;
      2. a Uniform Annual General Charge of $162 per separately used or inhabited part;
      3. a refuse collection targeted rate of $210 per service (reflecting the recent reallocation of corporate costs);
      4. the application of the next step of the long-term general rate differential strategy;
      5. the discontinuation of the five value-based targeted rates;
      6. a Central Business District residential targeted rate of $55 per unit;
      7. increasing the Central Business District non-residential targeted rate in line with the next step of the differential strategy;
      8. new mainstreet budgets and targeted rates;
      9. a 3.2 per cent discount for full payment of rates before 5pm on 20 August 2008;
      10. a remission of $128 for an approved alternative refuse service and $71 for an approved alternative recycling service (reflecting changes in the refuse collection and recycling components of the refuse collection targeted rate); and
      11. a maximum rebate of $530 and an income threshold of $21,180 under the extended rates rebate scheme (reflecting changes in the central government scheme).
    6. That it be noted that officers will review all rates policies for the 2009-2019 Long-term council community plan and will address some of the minor issues raised in the submissions through that process.
    7. That officers be requested to report back to the Finance and Strategy Committee on ways to create incentives for more cost effective collection of rates for 2009/2010.
    8. That officers be requested to investigate the merits and cost of a system for payment of council rates, fines and other bills at New Zealand post shops, with transaction costs being added to the payment.

    7.2. Annual Plan 2008/2009 Metrowater Water Price Consultation Update

    1. That it be noted:
      1. That approximately two thirds of the submissions received in relation to the water price options proposed in the draft 2008/2009 annual plan were supportive of keeping water prices in line with the Council's rate of inflation by phasing out charitable payments.
      2. That the option for removing charitable payments immediately, and the option for freezing charitable payments at $24 million per annum, attracted 18% and 16% support respectively.

      3. That officers have reviewed all of the submissions in relation to Metrowater and water price issues and consider that no submission raises any significant new matters with regard to the proposed changes to the charitable payment scheme and water prices increases.

    2. That the option for keeping water prices in line with Council's rate of inflation by phasing out charitable payments be adopted for the 2008/2009 annual plan and that the 2006-2016 Long-term council community plan be updated accordingly.

    7.3. 2008 Development Contribution Policy: Submissions and Policy for Adoption

    1. That it be noted that the final 2008 Development Contributions Policy has had the following updates since being presented to Combined Committees in March 2008:
      1. an increase in the gross capital costs used in the development contribution charge setting for community amenity projects has resulted in an additional increase in the community amenity charge of $67 per Household Unit Equivalent;
      2. an increase in the transport charges for isthmus and Wynyard Point of $61, due to an increase in the gross capital costs of isthmus transport projects; and
      3. various minor changes to clarify issues raised by submitters and further legal advice.
    2. That Auckland City Council's 2008 Development Contributions Policy be adopted, effective from 1 July 2008, and that authority be delegated to the Chair of Combined Committees, the General Manager Finance and the General Manager City Development to make any minor amendments to the policy arising from the Combined Committees meeting, including consequential changes required because of other decisions made at the meeting.

    7.4. Fees and Charges for Temporary Use of the Road Reserve

    1. That the transport fees and charges for temporary use of the road reserve be adopted as follows for the 2008/2009 annual plan, noting that they allow the recovery of reasonable costs incurred by Council in the processing of notifications and the auditing of work sites:
    Item Service description Unit measure

    Fee from1 July 2008
     (inc. GST) $

    1 Applications and occupations 
    1.1 Road openings (see note 4.3)    
    1.1.1 Minor works including retrospective Each 21
    1.1.2 Major works Each 37.50
    1.1.3 Project works Each 67.50
    1.1.4 Urgent processing requests Each 90
    1.2 Operations in the street (see note 4.4)    
    1.2.1.1 Light casual in parking lane or berm area only Per day 45
    1.2.1.2 Light casual in parking lane or berm area only Per week 135
    1.2.2.1 Heavy casual in parking lane or berm area only Per day 90
    1.2.2.2 Heavy casual in parking lane or berm area only Per week 270
    1.2.3 Annual operators permit in parking lane or berm area only Each 3,375
    1.2.4 Mobile cranes – see 1.4 below    
    1.2.5 Urgent processing requests Each 90
    1.3 LUC construction sites    
    1.3.1 Traffic management plan reviews (maximum charge is $400 excl GST) Per hour 90
    1.3.2 Temporary use of road reserve for hoarding, loading zones or other purposes on the footpath only. For occupancy of traffic lanes, see 1.4    
    1.3.2.1 CBD, Newmarket, Ponsonby and Parnell m2 pa 337.50
    1.3.2.2 Arterials and other retail and mixed business areas m2 pa 225
    1.3.2.3 All other areas m2 pa 112.50
    1.3.3 Urgent processing requests Each 225
    1.4 Temporary full and partial road closures (exceeding five minutes in any hour)    
    1.4.1 Advertising Each at cost
    1.4.2 Administration, including invoicing Each 45
    1.4.3.1 Arterial class roads Lane per day 562.50
    1.4.3.2 Collector class roads Lane per day 281.25
    1.4.3.3 Residential class roads Lane per day 112.50
    1.4.4 Urgent processing requests Each 90
    1.5 Temporary parking and no parking resolutions    
    1.5.1 Permit application processing and site audit Each 100
      Note: Parking services loss of revenue charges are additional    
    2 Auditing
    2.1 Road openings    
    2.1.1 Minor works (performance based) Each 45
    2.1.2 Major works (performance based) Each 67.50
    2.1.3 Project works (weekly) Each 90
    2.1.4 Follow-up where a non-compliance notice (NCN) is issued – all sites by specified date and ongoing daily until completed by the contractor or the council Each 90
    2.1.5.1 Project pre-commencement inspections   No charge
    2.1.5.2 Project practical completion – first inspection Per hour 90
    2.1.5.3 Project practical completion – subsequent inspections where required Per hour 90
    2.1.5.4 Project end of maintenance inspections Per hour 90
    2.2 Operations in the street    
    2.2.1 All sites (performance based) Each 45
    2.2.2 Follow-up where a NCN is issued – all sites by specified date and ongoing daily until completed by the contractor or the council Each 90
    2.3 LUC construction sites    
    2.3.1 CBD, Newmarket, Ponsonby and Parnell (weekly) Each 45
    2.3.2 Arterials and other retail and mixed business areas (monthly) Each 45
    2.3.3 All other areas (random) Each 45
    2.3.4 Follow-up where a NCN is issued – all sites by specified date and ongoing daily until completed by the contractor or the council Each 90
    2.4 Street damage deposits and private-to-public drainage connections    
    2.4.1 Pre-commencement (optional) Each 67.50
    2.4.2 Post CCC (mandatory) Each 67.50
    2.4.3 Follow-up where a NCN is issued – all sites by specified date and ongoing daily until completed by the contractor or the council Each 90
    2.5 Requests for service    
    2.5.1 Principal or contractor cause Each 67.50
    2.5.2 Follow-up where a NCN is issued – all sites by specified date and ongoing daily until completed by the contractor or the council Each 90
    2.6 Temporary traffic management    
    2.6.1 All sites (random and if a NCN is issued) Each 67.50
    2.6.2 Follow-up where a NCN is issued – all sites by specified date and ongoing daily until completed by the contractor or the council Each 90
    3 Other
    3.1 Non-notified works    
    3.1.1 Non-notified and/or not approved Per site 281.25
    3.1.2 Further delay in submitting application Per day 56.25
    3.2 Non-permitted temporary traffic management    
      Early establishment or late disestablishment    
    3.2.1 Arterial class roads Per hour
    or
    part hour
    843.75
    3.2.2 Collector class roads 450
    3.2.3 Residential class roads 168.75
    3.3 Non-notified full or partial road closures    
    3.3.1 Arterial class roads Per lane
    per day
    or part day
    843.75
    3.3.2 Collector class roads 450
    3.3.3 Residential class roads 168.75
    3.4 Unidentified works    
      Sites identified after completion but not notified    
    3.4.1 Excavation and identification of cause by the council's contractor Per site At cost
    3.4.2 Non-notified works Per site 450
    3.4.3 Administration Per site 90
    3.5 Non-actioned non-compliance notice    
    3.5.1 Rectification by the council's contractor Per site At cost
    3.5.2 Administration Per site 90
    1. That officers be requested to report to the Long-term council community plan direction setting meeting in October 2008 on the effectiveness of the transport fees and charges for temporary use of the road reserve in terms of affecting contractor behaviour.

    7.5. Auckland City Environments Fees and Charges

    That the increase to Auckland City Environments' fees and charges for the 2008/2009 annual plan be approved as follows, noting that a further full review including benefit apportionment will take place in early 2009:

    1. Staff charge-out hourly rates
    Staff positions Fees from 1 July 2008
    (inc. GST) $
    Senior planners, senior subdivision officers, licensing, team leaders 160
    Planners (levels 3 and 4), subdivision, licensing, environmental health specialists, arborists, urban designers 145
    Planners (levels 1 and 2), assistant planners, subdivision, licensing, planning technicians, urban design assistants 110
    Engineering, account or project managers 155
    Building officers, building inspectors, incident investigators, resource consent monitoring officers, environmental health officers 130
    Secretarial/administration staff 81
    1. Building consents

    Building control (where standard fees do not apply)

    Fee type by category Note Fee from
    1 July 2008
    (inc. GST) $
    Blasting
      Blasting permit   35
    Building code certificate 
      Liquor and brothel licence applications   293
      Liquor and brothel licence applications – each additional inspection   73
    Building consent processing – certifier consents 
      Certifier consents – no exclusions    consent category
    no longer applicable
      Certifier consents – with exclusions   consent category
    no longer applicable
    Code compliance certificate 
      Code compliance certificate – where final inspection completed more than four years ago   422
      Code compliance certificate – work < $2,000   66
      Code compliance certificate – work $2,001 to 20,000   172
      Code compliance certificate – work $20,001 to $250,000   229
      Code compliance certificate – work $250,001 to $500,000   546
    Certificate of acceptance Deposit 992
    Certificate of compliance Deposit  
      Where application does not fit within standard fees   306
    Certificate of public use   At cost
    Compliance schedules 
      Compliance schedule – administration fee   165
      Compliance schedule – per feature   60
    Disconnection of fire alarm 
      Disconnection fee   253
    Exempt building work 
      Including temporary works   150
    Extension of building consent 
      Application to extend the time a building consent is valid   130
    Hoarding 
      Per square metre   101
    Hoisting over footpath or public place 
      Mobile crane or other hoisting device – half day   68
      Mobile crane or other hoisting device – full day   135
      Mobile crane or other hoisting device – per week   222
      Mobile crane or other hoisting device – per month   444
    Independently qualified person – application for acceptance as (three-year period) 
      Base fee (also renewal fee)   70
      Charge per system or feature for which acceptance is sought   84
    Independently qualified person register 
      Charge per copy   25
    Lapsing a building consent   168
    Liquor licence fees 
      Liquor building certificate (building code certificate)   76
    Notice to fix 
      Fee applies irrespective of whether the notice to fix is associated with a live building consent or not    At cost
    Plumbing consents 
      Pre-paid plumbing consents (Enerco hot water cylinder installation) – book of 10   828
      Pre-paid plumbing consents (solar-powered hot water cylinder installation) – book of 10   828
    Producer statements 
      Work up to the value of $1,000,000   184
      Work over the value of $1,000,000   296
    Product assessments   At cost
    Project information memorandum  
      Project information memorandum   97
      Application made with a building consent application   252
      Illegal building work   252
      Project information memorandum – solid fuel heaters   30
    Scaffolds 
      Scaffold permit per 20m of street frontage per month   152
    Section 72   158
    Special inspection reports 
      Safe and sanitary   252
    Swimming pools inspection – existing pools 
      Swimming pool exemptions   766
      Swimming pool inspections (and re-inspections) – existing pools (from the third inspection)   199
    Temporary building work 
      Exempt work   Exempt building work fees apply
    (see above)
      Non-exempt work   Standard building consent fees apply
    Tie backs 
      Temporary tie backs per metre of frontage   88
    Use of street 
      Use of street for building operations – central area. Monthly fee per square metre of street
    air space for the first 12 months, then fee per square metre per week thereafter.
    Plus 50 per cent base fee per additional occupied level
      100
      Use of street for building operations – other areas. Monthly fee per square metre of street
    air space for the first 12 months, then fee per square metre per week thereafter.
    Plus 50 per cent base fee per additional occupied level
      35
    Vehicle crossing permit 
      Vehicle crossing permit   230
    Waivers 
      Application for waivers Deposit 496
    Warrant of fitness 
      Receipt, processing and issue of building warrant of fitness
    (only one compliance scheduled item)
      55
      Receipt, processing and issue of building warrant of fitness
    (more than one compliance scheduled item)
      110
    1. Building consent (where standard fees do not apply)
    Project categories O, P, Q, R, S 1 Fee from
    1 July 2008
    (inc. GST) $
    Estimated value of building work $ With producer statement Without producer statement
    500,001 to 1,000,000 624 1,180
    Additional for every 500,000 increment over 1,000,000 35 303

    Notes to table

    1. Building consent processing charges (standard fees)

    The fee for a building consent is calculated by adding the components of the application. Additional fees may apply where other checks are required. All fees are in dollars.

    Project category Fee from 1 July 2008 (inc. GST) $
    Lodge Admin Planning check Building proces-sing Records BRANZ BIA levy Drainage design Building over public drain Assess drainage video 1 Flood report Pump station Structural engi-neering Geo-technical engi-neering Fire engi-neering
    A 86 n/a 0 0     0 0 0 0 0 0 0 0
    B 86 n/a 44 65 35     80 158 158 118 383 80 80 80
    C 86 85 146 130 54     158 158 158 118 383 80 80 80
    D 86 85 146 260 54     158 158 158 118 383 80 80 80
    E 86 85 146 65 54     158 158 158 118 383 158 316 80
    F 86 85 146 260 54 Levy applies above $20,000 158 158 158 118 383 316 316 317
    G 86 85 146 260 54 158 158 158 118 383 316 316 158
    H 86 85 146 390 75     158 158 158 316 383 633 316 317
    I 86 85 146 390 75     238 158 158 316 383 633 316 158
    J 130 85 146 520 75     238 158 158 316 383 791 316 317
    K 130 85 292 520 75     238 158 158 316 383 475 316 158
    L 130 85 292 650 75     238 158 158 316 383 633 316 158
    M 86 85 292 390 90     317 158 158 316 383 633 316 158
    N 130 85 292 780 110     396 158 158 396 383 791 316 475
    T 86   44 39 0     0 0 0 0 0 0 0 0
    U No longer applicable
    V

    Notes to table

    Categories O, P, Q, R, S are excluded from standard fees and will be subject to an estimate or deposit plus invoice.

    Inspections – standard (up to 40 minutes) $107, final or cladding inspection $169.

    1. Building consent project category
    A Minor consent L New dwelling (executive)
    B Building work up to the value of $2000 M Attached dwellings
    C Kitset carport and garages N Commercial buildings and residential alterations valued $250,001 to $499,999
    D Residential swimming pool and fencing O Commercial buildings and residential alterations valued $500,000 to $1,000,000
    E All other building work valued $2001 to $5000 P Buildings valued over $1,000,000
    F All other building work valued $5001 to $19,999 Q Change of use and earthquake prone buildings
    G Residential alterations and additions valued $20,000 to $99,000 R Amendments to existing consents
    H Commercial building work valued $20,000 to $99,000 (BRANZ and BIA levy starts in this category) S Staged consents
    I Residential alterations and additions valued $100,000 to $250,000 T House removals
    J Commercial building work valued $100,000 to $250,000 U Consent category no longer applicable
    K New dwelling (standard) V Consent category no longer applicable
    1. Building consent deposits Hauraki Gulf islands
    Value of work Deposit from
    1 July 2008
    (inc. GST) $
    Up to $5,000 500
    $5001 to 25,000 800
    $25001 to 50,000 1000
    $50,001 to $100,000 1000
    $100,001to $150,000 1000
    $150,001 to $250,000 1500
    $250,001 to $500,000 1500

    Note to table

    The total cost of the consent will be calculated on a time and cost basis using the approved hourly rates.

    1. Planning check for Hauraki Gulf islands
    Project category Fee from
    1 July 2008
    (inc. GST) $
    B 44
    C 146
    D 146
    E 146
    F 146
    G 146
    H 146
    I 146
    J 146
    K 292
    L 292
    M 292
    N 292
    U Consent category no longer available

    Note to table

    For building consent project category, see table on previous page.

    1. Land use, subdivision, and engineering consents

    Land use fees – Isthmus

    Fee type by category

    Note

    Fee from
    1 July 2008 (inc. GST)$
    Land use – isthmus 
      Non-notified developments up to five units (excluding Hauraki Gulf islands) – total cost charged on a time-cost basis using the hourly rates Deposit 2,000
      Non-notified consent for developments of more than five units and up to and including 15 (excluding Hauraki Gulf islands) – total cost charged on a time-cost basis using the hourly rates Deposit 3,500
      Non-notified consent for developments of more than 15 units (excluding Hauraki Gulf islands) – total cost charged on a time-cost basis using the hourly rates Deposit 5,000
      Non-notified land use consent involving activities other than residential units and have more than three infringements and/or no written approvals Deposit  2,000
      Simple non-notified land use consent with restricted discretionary or restricted controlled activity status or discretionary status with one to three infringements and written approvals obtained Deposit 1,600
      Notified consent – developments up to five units Deposit  10,000
      Notified consents – developments more than five units and up to and including 15 units Deposit 15,000
      Notified consents – developments more than 15 units Deposit 20,000
    Notified land use consent involving activities other than residential units Deposit 10,000
    Limited-notified land use consent Deposit 5,000
      Outline plans/drawings lodged for consideration – total cost charged on a time-cost basis using the hourly rates Deposit 1,045
      Existing use rights assessment – central area Deposit 1,082
      Existing use rights assessment – other areas Deposit 522
      Confirmation of compliance certificate (Resource Management Act) Deposit 522
      Confirmation of compliance (signs bylaw) Deposit 522
      Consent to dispensation and/or exemptions or non-compliance with consolidated bylaw 1991 Deposit 2,000
      Section 127 Resource Management Act variation/cancellation   1,045
      Section 125 Resource Management Act – to extend the period a consent is valid   1,045
    Overseas investment certificate 
      Required by overseas investors to confirm the property meets the council's requirements   303
    Liquor licence fees 
      Liquor Planning Certificate   152
    1. Land use fees – Hauraki Gulf islands (HGI)
    Fee type by category Note Fee from
    1 July 2008
    (inc. GST) $
    HGI – Land use resource consents  
      Section 127 Resource Management Act 1991 variation/cancellation   1,045
      Section 125 Resource Management Act 1991 – to extend the period a consent is valid   1,045
      Non-notified land use consent (controlled activities) Deposit Non-notified
    land use consent fees apply
      Non-notified land use consent Deposit 2,000
      Notified application Deposit 10,000
      Confirmation of compliance certificate (RMA) Deposit 522
    1. Subdivision consent processing fees
    Consent type Note Fee from
    1 July 2008
    (inc. GST) $
    Boundary adjustment Deposit 665
    Completion certificate (Section 224C of the Resource Management Act 1991) – simple (no engineering input required)   175
    Completion certificate (Section 224C of the Resource Management Act 1991) – complex (engineering input required) Deposit 500
    Freehold subdivision of existing or approved complying development Deposit 995
    Freehold subdivision of new vacant lots Deposit 1,570
    Freehold subdivision of existing or approved development with development control modifications,
    eg height in relation to boundary, coverage etc
    Deposit 1,570
    Right of way   409
    Survey plan   275
    Unit title Deposit 1,015
    Variations and amendments Deposit 1,570
    Crosslease - first stage Deposit 1,570
    Crosslease - any subsequent stage Deposit 706
    Deposit for combined application for land use consent and subdivision consent Deposit 3,500
    Removal of building line restrictions, creation of easement certificate, cancellation of easements, amalgamation of certificates of title, unit title (5(1)(g)) certificate   366
    1.  Engineering fees
    Fee type by category Note Fee from
    1 July 2008
    (inc. GST) $
    Drainage 
      Drainage Deposit 1,515
    Engineering approvals 
      Up to 2 lots Deposit 605
      3 to 5 lots Deposit 1,210
      6 to 10 lots Deposit 3,790
      11 to 20 lots Deposit 5,300
      21 to 50 lots Deposit 10,610
      51 lots or over Deposit 15,190
    Producer statements 
      Engineering related – per producer statement   52
    Right of way 
      Engineering design right of way/jointly owned driveway Deposit 418
    Section 72 
      Section 72 fee   86
    Subdivision bond 
      Subdivision bond Deposit 835
    1. Bonds
    Bonds Note Fee from
    1 July 2008
    (inc. GST) $
    Processing bond applications relating to subdivision consent including return of money on satisfactory completion of work Deposit 835
    Application fee for bond relating to a land use consent (base fee charge may be greater depending on legal inputs)   650
    Administration of a bond relating to a land use consent, including release of the bond   625
    Processing an application to extend the time limit on an existing bond   112
    Processing an application for the partial release of a bond   345
    1. Environmental health and licensing fees
    Fee type by category

    Fee from
    1 July 2008
    (inc. GST) $

    All licences
      New premise application 130
    Amusement gallery/amusement devices
      Amusement gallery – annual licence 184
      Amusement device permit – per device, per 7 days 12.50
      Per additional device, per 7 days 2.40
      Per device, per additional 7 days or part 1.25
      Transfer of licence 55
      When combined with food – food fees plus 67
    Brothel licence
      Annual fee 591
    Camping grounds annual
      Camping grounds – new application 362
    Camping grounds
      Renewal 330
    Display of goods outside shops
      Permit 63
    Food premise licence annual fee 
      Small low – risk A grade 242
      Small low – risk B grade 314
      Small low – risk D grade 386
      Small low – risk E grade 483
      Large low – risk A grade 362
      Large low – risk B grade 472
      Large low – risk D grade 579
      Large low – risk E grade 723
      Small medium – risk A grade 483
      Small medium – risk B grade 627
      Small medium – risk D grade 772
      Small medium – risk E grade 965
      Large medium – risk A grade 723
      Large medium – risk B grade 940
      Large medium – risk D grade 1,158
      Large medium – risk E grade 1,447
      Small high – risk A grade 723
      Small high – risk B grade 940
      Small high – risk D grade 1,158
      Small high – risk E grade 1,447
      Large high – risk A grade 1,086
      Large high – risk B grade 1,411
      Large high – risk D grade 1,737
      Large high – risk E grade 2,170
    Food stalls
      Market Operator Licence (blanket licence for low risk food stalls, ie fresh fruit and vegetables) Food stalls – one day only 130

    30

      Level one – 12 months 30
      Level two – 6 months 90
      Level two – 12 months 150
      Level three – 6 months 180
      Level three – 12 months 300
    Funeral directors – mortuary licence
      Annual fee 362
    Hairdressers fees  
      Hairdressers all premises per annum 167
    Hazardous substances – inspections
      Bulk tank demolished 127
      Bulk tank for repair and maintenance 127
      Bulk tank installed 149
      Class 2 gas installation (other) 95
      CNG storage cylinders installed 127
      Inspection of any dangerous goods area 95
      LPG storage tank installed 127
      LPG/CNG equipment installed 63
      Maintenance of pipework 63
      Oil burning equipment – installation 83
      Oil burning equipment – maintenance 63
      Pump installed and re-located 63
      Pump removal 42
      Pump replaced or fixed 63
      Storage tank installed 129
      Storage tank replacement 150
      Tank removal 82
      Test pipelines to bulk installations 95
      Transfer or copy of any licence 46
    Health and bathhouse annual
      Health and bathhouse annual 242
    Health protection licence
      Basic (single process) 169
    Health protection licence annual
      Multi basic (multiple processes) 241
      High risk (involving skin penetration) 241
    Hourly rate for festival events
      Hourly rate for festival events 130
    Inspection fee

    130

    Mobile food vendor fee annual 26
    Mobile food – bun runner annual 26
    Offensive trades
      Application – annual 301
      Renewal 301
    Street trading
      Cafe seating on pavement – fee per chair per annum 63
      Short-term trading (up to 12 months) – public place. Permit and monthly fee set within criteria 110
      Long-term trading (over 12 months) – public place. Permit plus monthly fee set within criteria 164
      Hawkers annual 29
      Mobile shops annual 142
    Transfer fee – all licences 72
    Seizures under bylaws At cost
    Bylaw dispensation (other than permanent signage)
      Eg temporary signage 110
    1. Dog registration fees
    Fee type by category   Fee from
    1 July 2008
    (inc. GST) $
    Animal Control  
      Class S – Superannuitant 60 (40 if renewal paid
    before 31 July 2008)
    1. Property information fees
    Fee type by category Fee from
    1 July 2008
    (inc. GST) $
    Aerials
      GIS Plots – B&W aerials – 1993 8.50
      GIS Plots – Colour aerials – 1997 31
    Building consent report
      Approved building consents (monthly list) – approved/lodged consents – emailed 295
      Approved building consents (monthly list) – approved/lodged consents – printed and mailed 320
      Approved building consents (monthly list) – approved/lodged consents – printed over counter 315
    Drainage plans
      Private drainage plans – subsequent copies 7.50
    Faxes
      Faxes to Great Barrier Island – up to 10 pages 5
      Faxes to Great Barrier Island – 1 to 5 pages, per page see fee above
    (up to 10 pages)
      Faxes to Great Barrier Island – 6 to 10 pages, per page see fee above
    (up to 10 pages)
      Faxes to Great Barrier Island – 11 to 20 pages 10
      Faxes to Great Barrier Island – plus per page over 10 pages see fee above
    (11 to 20 pages)
      Faxes to Great Barrier Island – plus per page over 20 0.25
      Receiving faxes from Great Barrier Island – per page no charge
    LIMS
      Standard LIM (5 working days) 243
      Urgent LIM (4 hours) 312
    Map information
      Map information charge – 1 property map or 1 private drainage plan 12.50
    Neighbourhood report
      Neighbourhood report 30
    Print and copy 
      A2/A1 prints microfilm/EDMS/paper 9
      A3 EDMS/microfilm 5
      A3 photocopies – paper records 0.60
      A4 EDMS copies 1
      A4 photocopies – paper records 0.50
      AO prints microfilm/EDMS/paper 14
      Building warrant of fitness (copy) 7
      Code compliance certificate (copy) 7
      Coin-operated photocopier A3 0.60
      Coin-operated photocopier A4 0.50
      Public drainage, water services and contours on one map 42
      Contours map, public drainage map and special features on same map for the same property 52
      GIS viewing and print one plot 22
      Site remediation report 8 plus copy charges
      Soil reports 8 plus copy charges
    Property maps
      Property maps subsequent copies – public drainage, zoning and limitations, special land features, contours 12
    Site file CD
      Counter – non-urgent 58
      Counter – urgent 68
      Counter– while you wait (up to 30 minutes) 78
      Internet – non-urgent 47
      Internet – urgent 58
    Site information charge
      For each site researched (assisted by staff for up to 15 minutes, thereafter charged on time and cost basis) no charge
      For each site researched 15
    Valuations
      Certified copy 27
      Additional data P3 see fee above
    (certified copy)
      Sales data P4 see fee above (certified copy)
      Valuation screen P1 see fee above (certified copy)
    1. That Metrowater's peer review fees, in accordance with the requirements of their Service Level Agreement with Auckland City Environments, be added to the applicants invoice as follows:
    Consent Advice Scale or other Advice Determinant Charge (inclusive of GST)*
    All large or complex projects Large $930 deposit To be supplemented by an hourly charge of $155 inc. GST where required
    Flood Hazard Small to Medium $155 (Fixed fee)
    Assessment of Environmental Effects Small to Medium $620 (Fixed fee)
    Build-overs   $250 (Fixed fee)
    Water Supply (including fire hydrants)   $155 (Fixed fee)
    Engineering

    (upgrading or extending the public supply and drainage system – SW, Ww and WS)

    Materials, Grades, Cover, Tree-related $155 (Fixed fee)
    Thrust, Outlets, Piping of open watercourses, Stormwater Treatment and Mitigation Devices, Soakage $310 (Fixed fee)

    Note: The fees are consistent with ACE engineers charge out rate, which are $155/hr.
     

  5. TopAnnual Plan

    8.1. Other changes to 2008/2009 Budget

    A. That the following projects, as consulted on in the draft 2008/2009 annual plan, be deferred or cancelled:

    Row

     Project name Brief description Change Operating cost impact of reinstating the project ($000s)
    2008/ 2009 2009/ 2010 2010/ 2011 2011 to 2016 per annum

     Arts, Community and Recreation 

    1 Aotea Centre/Aotea Square interface $17.5 million to upgrade Aotea Centre external steps and terraces, new ticket sales and cafe kiosk Reduce budget by $7.9 million in 2009/2010 and 2010/2011 0 $123 $648 $1,098
    2 254 Ponsonby Road development $2 million to develop an urban square in the heart of the Ponsonby business area Defer 3 years to start in 2011/2012 $2 $45 $191 $126
    3 Sylvia Park surrounds $4 million to improve safety and quality of reserves in the Tamaki area Defer 3 years to start in 2012/2013 $0 $36 $207 $97
    4 Glen Innes town centre upgrade (stage two) $5 million to revitalise Glen Innes town centre business and residential areas Defer 3 years to start in 2012/2013 $0 $73 $268 $322
    5 Volcanic cones programme $5.5 million to protect and enhance Auckland city's volcanic features Defer $2 million of the 2009/2010 budget by 1 year $0 $80 $232 $30
    6 Tamaki streetscape upgrade $6 million to upgrade the public space in the business areas adjacent to the Tamaki campus and Mount Wellington Quarry residential development Defer 3 years to start in 2012/2013 $0 $73 $341 $385
    7 Mount Wellington quarry open space development $8.9 million to develop high quality open spaces within Mount Wellington Quarry development Defer 1 year to start in 2010/2011 $0 $78 $292 $140
    8 Open spaces land acquisition $12.5 million to purchase land around Wynyard Point and Viaduct Harbour Defer 1 year to start in 2015/2016 $0 $0 $0 $191
    9 Land purchases to improve harbour access $40 million to acquire land in order to improve access to coastal areas Defer 2 years to start in 2011/2012 $0 $363 $1,175 $1,132
    10 Harbour walkways – Blockhouse Bay to Onehunga $1.5 million to develop harbour walkways from Blockhouse Bay to Onehunga Defer 2 years to start in 2010/2011 $0 $4 $25 $60
    11 Glen Innes music and arts centre $5 million to build a music and art centre Defer 1 year to start in 2013/2014 $0 $0 $0 $132
    12 Point Erin pool redevelopment $5.4 million to provide all year facilities for the core activities of learning and fitness Defer 2 years to start in 2011/2012 $0 $116 $454 $124
    13 Jordan Recreation Centre redevelopment $6.7 million to improve the recreation centre in Onehunga to provide a modern and better functioning facility Defer 1 year to start in 2012/2013 $0 $0 $0 $141
    14 Auckland Domain sand carpet installation $5 million to install sand carpet and drainage to the lower sport fields of the Auckland Domain Defer 1 year to start in 2009/2010 $73 $288 $266 -$11
    15 Paved area renewals – citywide

    $2.6 million to renew paved surfaces within Auckland city's parks

    Defer $800,000 of capital expenditure by 1 year to 2009/2010 $32 $90 $60 -$2
    16 Auckland Zoo – Te Wao Nui $16 million to develop a dedicated precinct to highlight the unique flora and fauna of New Zealand Defer 1 year to complete project by 2010/2011 $144 $795 $185 -$7
    17 Lorne Street stage 2 (library and canopy) $5.2 million to improve pedestrian use in front of the central library by widening the footpaths, and introducing new paving and landscaping Defer 3 years to start in 2011/2012 $104 $439 $685 $149
    18 Pah Homestead restoration $5 million to restore Pah Homestead in Monte Cecilia Park Bring forward $1.5 million to prevent deterioration of the building, and defer $4.5 million for the restoration by 3 years to start in 2013/2014 -$56 -$193 -$103 $279
    19 Monte Cecilia Park development $1.2 million to improve the path network and restore the garden area surrounding Pah Homestead Defer 3 years to start in 2011/2012 $46 $130 $124 $3
    20 Otahuhu library redevelopment $6 million to construct a new library at the Otahuhu recreation precinct Defer 3 years to start in 2011/2012 $24 $180 $551 $325
    21 Improving community facilities $17 million to improve accessibility to community facilities and to complete the Wesley Youth Space project Retain $1.5 million in 2008/2009 for the Wesley Youth Space project, but cancel remainder of project $45 $230 $469 $1,168
    22 Blockhouse Bay library redevelopment $2.2 million to increase the capacity of Blockhouse Bay Library Defer 1 year to start in 2009/2010 $6 $91 $213 -$3
    23 Waiheke library redevelopment $3.2 million to build a new library at Oneroa Defer 1 year to start in 2009/2010 $63 $180 $120 -$5
    24 Mount Roskill library redevelopment $1.4 million to expand and redevelop the library in its current location Defer 1 year to start in 2009/2010 $38 $90 $37 -$2

     City Development

    25 Stormwater water quality improvements $16 million to build new stormwater assets, which will reduce the sewerage discharge into the harbours Cancelled, but the council will endeavour to reprioritise other projects to continue this work $80 $278 $480 $1,066

     Transport

    26 Temporary Civic car park $9.8 million to build a temporary car park to reduce parking space shortage during the Civic car park roof replacement Cancelled, as new construction method allows more car park spaces to be in use during construction $393 $1,318 $1,303 $1,261
    27 New wharves – Motuihe, Browns and Motutapu islands $5.5 million to provide access during all tides and facilities for smaller passenger ferries Defer 1 year to start in 2009/2010 $10 $107 $282 $65
    28 Liveable streets $29.5 million to improve safety and amenity of the roads for pedestrians and cyclists $1.5 million for 2008/2009 and the rest cancelled $0 $145 $616 $1,986
    29 Footpaths upgrade $49 million to upgrade the state of the city's footpath network and vehicle crossings  Defer $7.6 million of the 2008/2009 budget by 1 year $306 $864 $522 $233
    30 School transport safety initiatives $4.8 million to implement 40 km/h school speed zones, which provide safer environments outside schools Reduce budget by $300,000 in 2008/2009 and 2009/2010 $6 $32 $54 $53
    31 AMETI – land purchases $231 million to purchase land required to deliver transport infrastructure and service improvements in the Tamaki area Retain $33.7 million in 2008/2009, and defer remainder for 1 year $1,355 $4,295 $6,261 $1,422
    32 AMETI – construction $480 million in the next 8 years to progress design and construction phases to deliver transport infrastructure and service improvements in the Tamaki area Defer 1 year to start in 2010/2011 $0 $237 $2,348 $6,116
    33 Cycleway and walkway improvements $8 million to extend pedestrian and cycling network citywide Defer $3 million of 2012/2013 and 2013/2014 budget by 3 years 0 $0 $0 $127
    34 Tiverton and Wolverton improvements $8 million to upgrade these arterial roads for future transport demand Defer 3 years to start in 2011/2012 $72 $431 $726 $159
    35 Civic bus station development $10 million to build a bus station on the west Bledisloe car park site Cancelled $9 $55 $243 $902
    36 Neilson Street improvements $23.6 million to ease expected congestion and improve safety resulting from the SH20 Manukau Harbour crossing Defer 1 year to start in 2009/2010 $0 $15 $65 $385
    37 Unscheduled land acquisition $70 million over 6 years to purchase land designated for transport purposes, including Dominion Road Defer half of the budget by 1 year $58 $175 $245 $194
    38 Land acquisition for public transport initiatives $13.7 million to purchase land, build rail precincts, park and ride facilities, bus interchanges and passenger connections in growth priority areas Defer $850,000 of 2008/2009 budget by 1 year $16 $37 $36 $35
    39 Fanshawe Street traffic underpass $100 million to build an underpass beneath Fanshawe Street if required by the Wynyard Point development Defer 1 year to start in 20015/2016 $0 $0 $0 $1,059
     Civic Leadership
    40 Wynyard Point marine events centre $19.5 million to create a world-class marine events centre on the wharves north of Jellicoe Street Defer 1 year to start construction in 2009/2010 $241 $915 $929 $120
    41 Teal Park development $3 million to create a park and beach at Mechanics Bay Defer 3 years to start in 20011/2012 $80 $334 $435 $70
    42 Harbour Bridge Park development $3 million to create a park to the west of Auckland Harbour bridge Defer 3 years to start in 2011/2012 $40 $187 $336 $149
    43 Westhaven Marina open space development

    $19.6 million to develop public spaces at Westhaven Marina

    $800,000 required in 2008/2009 for design and defer remainder by 3 years to start in 2011/2012 $354 $1,697 $2,830 $663
    44 Wynyard Point pedestrian over-bridges $10 million for two pedestrian bridges over Fanshawe Street – one linking Victoria Park to the proposed Daldy Street park and one linking to Bouzaid Way Defer 1 year to start in 2012/2013 $0 $0 $0 $252
    45 International facilities $70 million contribution to create an international scale convention centre in the CBD Budget revised from $70 million to $60 million over 3 years from 2011/2012 $0 $0 $0 $1,694
    46 Development with Vision $349 million to support the council in taking a more active and enhanced development role to promote high quality developments Retain $95 million in 2009/2010 for strategic waterfront purchases and development, and defer remaining budget 2 years $4,637 $7,355 $5,912 $4,174
    47 Rugby World Cup 2011 and Eden Park precinct projects $22 million for infrastructure around the Eden Park precinct and $10 million to support the Rugby World Cup event Reduce budget from $50 million to $32 million $440 $2,220 $3,790 $2,495
     Total average rates impact $8,617 $24,006 $33,853 $30,553
    1. That the funding for the following projects and services be added to the budget with any additional operating expenditure funded from the $2.4 million surplus budgeted.
      1. replacement of the Civic Theatre seats - $1.27 million in 2008/2009;
      2. Cliff Road remediation project - $4 million in 2008/2009;
      3. street cleaning in suburban centres - $65,000 per annum with the Arts Culture and Recreation Committee to prioritise the suburban centres to receive the additional street cleaning;
      4. development of reserves one and two at Stonefields - $950,000 in 2008/2009.
    2. That the $2.4 million surplus in the 2008/2009 budget be retained to address the additional expenditure approved, and any unbudgeted issues that arise in 2008/2009.
    3. That the officers be requested to report on the Mt Roskill Community Board submission on prioritising the Pah Homestead restoration and prevention of deterioration ahead of the Mt Roskill Library upgrade and that the report be considered by the Mt Roskill Community Board and then a joint meeting of the Arts, Culture and Recreation Community Services Committees.
    4. That the strategic importance of the Onehunga area as a gateway to the city and as an area within which there are a number of proposed public works that will impact on Onehunga be noted, and that the following be included in the 2008/2009 annual plan:
      1. That an Area Plan be funded for the Maungakiekie/ Onehunga area that, following public consultation, will provide an agreed planning framework for the area that defines areas of growth, character areas, town centre development, business areas and future public works;
      2. That a masterplan be funded (in collaboration with the Auckland Regional Council) for the entire Onehunga Foreshore area;
      3. That as part of the open space network funds be provided for the purchase of additional recreational land / sports fields and open space at Captain Springs Road on the Mangere Inlet;
      4. That it be noted that a $40m fund has been provided from 2011/2012 for land purchases for harbour access, part of which are targeted at the Manukau Harbour, and that work will commence to scope and prioritise these strategic purchases;
      5. That it be noted that funding from 2010/2011 for further development of a coastal walkway along the Manukau Harbour within Auckland City Council boundaries, and expanding on the existing Onehunga walkways has been foreshadowed; and in addition, that the recent discussions with Transit NZ about the Onehunga motorway and the impact on the foreshore be noted; and that negotiations have commenced to ensure that Transit includes the necessary mitigation measures within the Outline Plan for the motorway widening.

    8.2. Annual Plan 2008/2009 with Amendments to the LTCCP 2006/2016 Document

    1. That the Auckland City Council's Annual Plan 2008/2009 document, which includes the amendments to Auckland City Council's Long-term council community plan 2006-2016 be adopted, subject to the following:
      1. page 74, that a new milestone be added to the existing arterial network as follows:

        Milestone
        Complete the preliminary design and consultation with the community on the short-term actions (eg clearway extension and restricted side road access) for improving access between the CBD and the Airport
        Milestone to be finished by May 2009
        Who is working with Council Transit NZ, Auckland Regional Transport Authority, Auckland International Airport Limited

      2. page 23, under Metrowater water prices, the second sentence to be amended to read "with our decision water prices will be limited to rises at the council's rate of inflation which we believe will improve affordability".
    2. That it be noted that all submissions raised regarding the content of the annual plan will be reconsidered by officers when preparing the 2009-2019 Long-term council community plan.
    3. That authority be delegated to the Chairman of the Finance and Strategy Committee and the General Manger Finance to make changes to Auckland City Council's Annual Plan 2008/2009 document, which includes the amendments to Auckland City Council's Long-term council community plan 2006-2016 document that reflects decisions from this meeting, Audit New Zealand requirements, and other minor editorial changes.
       
  6. Top Rates Resolution for 2008/2009

    1. That Auckland City Council's four rates instalment dates for the 2008/2009 financial year be confirmed as follows:
      • 20 August 2008
      • 20 November 2008
      • 20 February 2009
      • 20 May 2009
    2. That a 10 per cent penalty for late rates payments for the 2008/2009 financial year be approved.
    3. That the rates resolution (as per appendix 1) for the 2008/2009 financial year be adopted.

    A division was called for, voting on which was as follows:

    For the Motion: Against the Motion:
    Councillors: Douglas Armstrong

    Ken Baguley

    Aaron Bhatnagar

    Mark Donnelly

    Deputy Mayor David Hay

    John Lister

    Peseta Sam Lotu-Iiga

    Toni Millar

    Greg Moyle

    Graeme Mulholland

    Noelene Raffills

    His Worship the Mayor John Banks

    Councillors: Cathy Casey

    Graeme Easte

    Glenda Fryer

    Richard Northey

    Denise Roche

    Councillors Leila Boyle, Bill Christian and Paul Goldsmith were absent.

    The motion was declared CARRIED by 12 votes to 5.

    There being no further business the Chairman closed the meeting at 5pm.